Name of Tender: Supply of materials, to rehabilitation and upgrading of a hand-dug well into a water yard in Juldo Town, WJM locality – Zalingei, Central Darfur State
Tender Number RFQ# CRS-SD-ZAL-SD5313-2025 Opening submission date: 31th of August 2025 Deadline Submission date: 14th of September /2025 – 04 :00 PM Please submit your bid to CRS Zalingei or via electronical email: tender.sudan@crs.org
|
اسم العطاء: توريد مواد بناء ، واعادة تأهيل وترفيع بئريدوية إلى محطة مياة متكاملة في مدينة جولدو، محلية غرب جبل مرة – زالنجي، ولاية وسط دارفور
رقم العطاء: RFQ# CRS-SD-ZAL-SD5313-2025 تاريخ فتح التقديم 31 أغسطس 2025 تاريخ انتهاء التقديم
41 سبتمبر 2025 04:00 العصر الرجاء ارسال عرضكم الي مكتب الاغاثة الكاثلوكية زالنجي أو من خلال البريد الالكتروني |
|
Dear Sir / Madam, CRS Sudan is looking for companies to provide the items/services shown in Attachment 1 at a competitive price and with high quality.
General Requirements 1. Must Be Registered to conduct the business and in compliance with federal governments tax regulations in Sudan 2. Experience International Organizations, Non-Governmental Organizations, or large private companies will be an advantage. 4. CRS retains the right to reject, cancel, negotiate, amend, split and accept any offer, without consideration of the lowest offer. 5. This is an invitation to vendors and is not a promise or obligation that CRS will contract with suppliers through the submitted offers. 6. Relevant bid committee may request for physical samples of some items during evaluation process of bids. 7. The work plan must be provided by the contractor with the tender package. 9.The banking information should be specific and clear.
|
سيدي / سيدتي العزيز(ة) هيئة الإغاثة الكاثوليكية برامج السودان تبحث عن شركات من المهتمين بتوفير المواد/ الخدمات المشار إليها أدناه في الملحق رقم 1 بأسعار منافسة وبجودة عالية. متطلبات عامة: 1 . يجب أن يكون مسجلا لإجراء الأعمال التجارية مع ما يتوافق ولوائح الضرائب الحكومية في السودان . 3 . الخبرة في تزويد المنظمات الدولية، المنظمات الغير حكومية، أو الشركات الكبيرة الخاصة ستكون ميزة. 4 . تحتفظ هيئة الاغاثة الكاثوليكية بالحق في رفض، إلغاء، التفاوض، تعديل، تجزئة وقبول أي عرض، دون النظر الى أدنى عرض. . 5. هذه دعوة للموردين وليس وعد أو التزام من هيئة الإغاثة الكاثوليكية للتعاقد مع الموردين من خلال العروض المقدمة 6. قد تقوم لجنة الإحالة المعنية بطلب نماذج عينية لبعض المواد اثناء عملية تقييم العروض. 7. يجب على المقاول تحضير الجدول الزمني لتنفيذ الاعمال على ان يتم تسليم المستند مع اوراق العطاء 9. يجب ان تكون معلومات وتفاصيل رقم الحساب واضحة.
|
|
Payment Terms
|
يجب أن تظل العرض ساريًا لمدة تصل إلى تسعين (60) يومًا من تاريخ إغلاق التقديم.1 2. يتم إجراء الدفع عبر شيك بنكي أو تحويل بنكي خلال خمسة عشر (15) يوم عمل من تاريخ استلام الفاتورة الصحيحة. 3. يتم إجراء الدفع بعد التحقق وقبول الخدمات وفقًا لشروط العقد أو أمر الشراء |
|
Acceptance of Payment Terms Do you accept the above payment terms?
|
الموافقة على شروط الدفع: هل توافق على شروط الدفع اعلاه:
|
|
Requested Information The submission must include:
|
يجب تقديم ما يلي: يجب ان يتضمن التقديم ما يلي :
|
|
Bid Requirements Offers that do not meet the following will be automatically rejected regardless of price:
|
معلومات ملء العطاء سوف يتم رفض أي عطاء لا يلتزم بالشروط أدناه بغض النظر عن السعر:
11 - جب أن تتم الموافقة على حفرة الأساس وعمق الحفرة من قبل ممثل فريق العمل الميداني لمنظمة CRS قبل البدء في أي خطوات تنفيذية
|
|
Delivery Instructions: Complete and stamped and signed offer can be submitted directly to CRS Zalingei office.
Complete and stamped and signed offer must be delivered in sealed envelope with tender number on it (RFQ# CRS-SD-ZAL-SD5313-2025) Delivery to CRS Sudan office located in Zalingei |
تعليمات التسليم: يجب تقديم العطاء الكامل والمختوم و الموقع في مكتب زالنجي
يجب ان لا تتجاوز السيرة الذاتية للشركة اكثر من 10 صفحات.
المنظمة في زالنجي
|
Experience Reference List
قائمة مراجع الاعمال السابقة
|
|
Name of Organization أسم المنظمة |
Name of Person أسم الشخص |
Name of Project أسم المشروع |
Project Start Date تاريخ المباشرة بالمشروع |
Project duration مدة تنفيذ المشروع |
Phone Number رقم الموبايل |
Email Address البريد الالكتروني |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Company name: أسم الشركة : |
|
|
Legal address: العنوان الثابت: |
|
|
Telephone Number: رقم الهاتف: |
|
|
Email: عنوان البريد الإلكتروني: |
|
|
Representative Name اسم الممثل: |
|
|
Business Certificate Registration Number: رقم تسجيل شهادة العمل: |
|
|
Tax registration Number: رقم التسجيل الضريبي: |
|
|
Contract duration: مدة العقد : |
|
|
Bank details:
|
تفاصيل الحساب:
إسم الينك : -------------------------------------------------------
الفرع ------------------------------------------------------------------------
|
|
Do you have partnerships with any other companies (such as shared management / staff / office / bank account)? Do you cooperate with any other companies in preparing offers or providing of goods or services? هل لديك شراكات مع أي من الشركات الأخرى ( مثل إدارة / الموظفين / المكتب حساب مشترك / البنك) ؟ هل تتعاون مع أي من الشركات الأخرى في إعداد العروض أو توفير السلع أو الخدمات؟ |
|
|
If the answer for previous question is yes, please provide details here including the names of partner companies. إذا كان الجواب عن السؤال السابق نعم ، يرجى تقديم التفاصيل هنا بما في ذلك أسماء الشركات الشريكة |
|
|
Other comments: ملاحظات اخرى: |
|
|
Experience / references for the related work of experience (Please attached any related contract, purchase order, certificate, etc.) that does not exceed 10 pages. References MUST include contact information. يجب ان يحتوي على عناوين الاتصال من مراجع الخبرة المرجع من الخبرة ( الرجاء ارفاق دليل من الاعمال السابقة ذات الصلة من عقود , اوراق شراء , ورقة اتمام عمل , اخرى ) لا تتجاوز عشرة اوراق. |
|
|
Signature التوقيع |
|
|
Date التاريخ |
|
Attached (1)
Specifications: -
Scope of Work for Rehabilitation and Upgrading of Hand-Dug Well to Water Yard in Juldo town/WJM locality.
Catholic Relief Services (CRS) – United States Conference of Catholic Bishops, an international relief and development agency, committed to the alleviation of human suffering, development of people and fostering of charity and justice in the world irrespective of race, creed, or nationality.
CRS seeks qualified entity specialized and experienced in water industry and construction of water systems (including water wells, water pumping components, solar energy set, elevated water storage and distribution pipework etc.) to work in Juldo Town in West Jebel Mara locality (Nertiti) - Central Darfur State; the activities include rehabilitation of hand dug well, upgrading to mini water yard consists installation of submersible pump, solar energy unit, installation of elevated water tank and water pipework, and fencing of each component of the system, during the period from 1th Sep 2025 to 15th Oct 2025.
Primary Functions:
Under the overall guidance and direct supervision of CRS WASH Senior project officer (SPO), the contractor should rehabilitate, and upgrade one hand dug well to water supply, storage, and distribution system in line with technical guidelines of Water and Environmental Sanitation Project (WES)-Sudan and CRS field staff.
The contractor responsibilities:
The specific tasks of the contractor under this scope of work should be implemented under direct supervision and instruction of CRS field staff, and each completed stage of the work should be accepted and approved by CRS field staff, and the contractor should implement and complete any required repair or amendment before starting the next stage. The work includes, but not limited to the following:
Bill of quantities and quotation:
|
No |
Item Description |
Unit |
Q’ty |
Unit price USD |
Total price USD |
|
1 |
Rehabilitation of hand dug well |
||||
|
1.1 |
Remove existing two steel beam and build and raise the top of the lining above ground surface by additional 1 meter, should be built of red bricks and/or stones based on existing materials type and cement-sand mortar. (the diameter of the well is 4.5 meters)
|
Job |
1 |
|
|
|
1.2 |
Construct a tight well cover of reinforced concrete slab with a manhole (60cm*60cm) with lid equipped of lock to enable future cleaning and maintenance of the well. The reinforced cover of the manhole should be tight and leakage proof.
|
job |
1 |
|
|
|
1.3 |
Install heavy duty steel beams at the top of the well to support the concrete cover, pumphouse casing, and hold the pump.
|
job |
1 |
|
|
|
1.4 |
Install pedestal of hand pump Indian mark II in concrete cover to support accommodation UPCV casing.
|
job |
1 |
|
|
|
1.5 |
Install pump house pedestal, UPVC pipe and screen, from the top to the bottom of the well with diameter within range from 5 to 8 inches to properly fit the bowl size of the selected pump and allow suitable clearance for safe installation and retrieval of the pump. The top 6 meters of the casing and 2.5 meters at the bottom of the casing should be of blind (plain) casing and the portion in between is 3 meters should be of original UPVC screen of slot size range 0.04-0.06 inch,
|
m |
11 |
|
|
|
1.6 |
Clean the lining wall by using suitable long-handled wire brush to remove the algae and other dirt layers, then wash with high pressure water jet.
|
Job |
1 |
|
|
|
1.7 |
Digging and cleaning the bottom of the well and remove the sludge and all materials deposited inside the well at the bottom until all the original total depth is cleaned i.e. to remove at least 2.5 meters-thick layers of deposits from the bottom, to increase the current free depth from 7.5 m to 10 m (original depth).
|
job |
1 |
|
|
|
1.8 |
Dewater the well until the turbid water completely discharged out and the turbidity level around 5 NTU unit or less.
|
job |
1 |
|
|
|
1.9 |
Disinfect the well with high (concentration) chlorine dose applying shock chlorination processes according to the standard steps for chlorination.
|
job |
1 |
|
|
|
1.10 |
Dewater the well and measure the residual chlorine.
|
job |
1 |
|
|
|
1.11 |
Construct a fence around the well 7m*7m using gabion wire 4mm, roll 10m*2m high to be supported on top by rolled mesh wire; including door 1m width*1.6m high with control lock and paint the steel pillars with blue color, all pillars should have welding on top with iron angle 1.5”, 30cm length Y-shape to carry rolled mesh wire.
|
job |
1 |
|
|
|
|
Sub-total (1) |
|
|||
|
2 |
Supply and Installation of Submersible pump and pipe work |
||||
|
2.1 |
Import Pump model Grundfos 25‑SQF‑7 (submersible) Flow 8 m³/h @ 25 m head Motor power (P₁) 1.6 kW; current ≤ 8.4 A Pump weight (net) 9 kg |
no |
1 |
|
|
|
2.2 |
Drop‑cable length 124 m, use 6 mm² Cu 3‑core EPR String voltage (Vₘₚ) 120‑180 VDC |
m |
124 |
|
|
|
2.3 |
Backup inverter 1.6 kw pure sine wave (3-phase) Control accessories CU‑202, IO‑50 (DC), IO‑101B (AC backup) |
no |
1 |
|
|
|
2.4 |
The rising main from the pump to the ground surface should be of galvanized pipe or stainless-steel pipe 12m size 2”.
|
m |
12 |
|
|
|
2.5 |
The outlet of the rising main at well source should be equipped with nonreturn and gate valves.
|
no |
2 |
|
|
|
2.6. |
Provide and install high density polythene pipe of 2 inches diameter total length 120m to connect the discharge point, at the well level, with the galvanized (GL) pipe connecting the inlet of the elevated water tank length 100m. The remaining 20m high-density polythene 2 inch, be connected with descending galvanized pipe 3-inch outlet to distribution point tap stand including cart filling and Iron movable animal trough 6m*0.4m*0.6m.
|
m |
120 |
|
|
|
2.7 |
Excavate trench of one 1 meter depth and 100 meters long extended from the water well to the elevated water tank for installing of the water pipe, 20m from elevate tank to distribution point and animal trough; the rough portion of trench should be backfilled with 15 cm-thick soft soil layer under the pipe and 25 cm-thick layer above the pipe then complete back filling of the remaining portion with the cutting excavated from the trench or alternative suitable soil materials.
|
m |
120 |
|
|
|
|
Sub-total (2) |
|
|||
|
3 |
Supply and Installation of Solar energy unit on top of the tank and all fencing |
||||
|
3.1 |
Provide and install complete solar energy unit with all accessories to properly operate the pump. String voltage (Vₘₚ) 120‑180 VDC Solar array size 2.4 kWp → 8 × 300 W panels (2 strings of 4 panels in series).
|
set |
1 |
|
|
|
Construct mounting structure to carry Solar panels, it should be supported with heavy duty steel or Ukrainian skeleton (4m*4m area at 15 degree) and elevated at least 85cm meters above the top of the tank surface to allow labor for chlorination processing and future maintenance). |
job |
1 |
|
|
|
|
3.3 |
Provide materials and construct tight fencing 2m high (15m*10m) around elevated water tank, solar panels, distribution point and cart filling together using heavy duty steal or galvanized poles (Angles or pipes) 3 meters high with spacing 2 meters or less, and barbed wire gabion 4mm supported on top with mesh wire rolled fixed on Y-shape angle welding on to of pillars and equipped with door 2m*2m and locks (the fencing should split in between tank and tap stand with partition gabion wire and door 1m*1.6m to allow guard to operate system).
|
Job |
1 |
|
|
|
|
Sub-total (3) |
|
|
|
|
|
4 |
Supply and Installation of steal water tank and tower |
||||
|
4.1 |
Provide and install cylindrical steal water tank made of mild steel plates, of capacity 20,000 liters, thicknesses 6mm for the bottom 5mm for side wall and 4mm for the top cover placed on steal tower 4-meters height, with accessories and the main requirement included, but not limited to what specified in scope of work hereabove. |
job |
1 |
|
|
|
4.2 |
Provide materials, fabricate, and erect steal tower of 4 meters height supported by ladder with bearing capacity of 27 tons to curry 20 cubic meter steel tank according to standard specification and guideline of Public Water Corporation (PWC). Including but not limited to specification in the scope of works hereabove.
|
job |
1 |
|
|
|
|
Sub-total (4) |
|
|||
|
5 |
Supply and Installing distribution pipeline 2” diameter |
|
|||
|
5.1 |
Supply and install high density polythene pipeline of 2” diameters to distribution point and 10 meters length to connect through (reducer) 3” *2” with descending galvanize pipe from the elevated tank.
|
m |
30 |
|
|
|
5.2 |
Connect extension of 2”-diameters, 10 meters long high-density polyethene pipe connect with the pipeline 3” descending GI pipe from elevated tank with control valve to supply tap stand and cart filling.
|
m |
30 |
|
|
|
5.3 |
Digging 1 meter-depth and 15 meters-long trench to accommodate the pipeline from the elevated water tank to tap stand and cart filling.
|
M |
30 |
|
|
|
5.4 |
Back fill the rough section of the trench bottom back fill with fine soil from the bottom up to 15cm thick.
|
M |
30 |
|
|
|
5.5 |
Lay the pipeline in the trench and backfill with soft materials up to 25cm above the pipe then backfill the remaining portion of the trench up to the top i.e. ground surface with the cutting excavated from the trench or other available suitable source.
|
m |
30 |
|
|
|
|
Subtotal (5) |
|
|||
|
6 |
Construction of tap stand |
|
|||
|
6.1 |
Provide complete set of plumping materials and fittings for Construct tap stand of 12 taps connected to 2” GL pipe equipped with gate valve, installed on platform built of red bricks, and cement-sand mortar. The planned location is 8 meters apart from the distribution point. . |
set |
1 |
|
|
|
6.2 |
The platform construction: The foundation of the platform should be of a minimum 1.5 m width, 3 m long, and (0.4 m to 0.5 m) depth. The height of the platform is 0.6 m, with 1.25 m height of the tap stand.
|
job |
1 |
|
|
|
6.3 |
Provide and cover the top and sides of the platform with white tiles.
|
job |
1 |
|
|
|
6.4 |
The ground area (10m*7,5m) content tap stand, cart filling should build by red brick and sand, cement mortar above ground 15cm and lay concrete slap 5cm thick above with slop to allow superfluity water poured by consumers to flow through drainage 10m away from distribution point with trough (1m*1m*0.8m) supported by over flow pipe 1” to irrigate plants and the remining area the same size content elevated tank shall be laid only by gravel 5cm thickness.
|
job |
1 |
|
|
|
6.5 |
Provide plumping materials and connect the tap stand with the descending galvanize pipe 3” size with high-density polythene pipe 2”.
|
job |
1 |
|
|
|
6.6 |
Provide plumping materials and connect the tap stand with the descending galvanize pipe 3” size with high-density polythene pipe 2”.
|
job |
1 |
|
|
|
6.7 |
fabricate moveable steel animal trough sized 0.6*0.6* 6 meters long outside the fencing area and supply by transmission line 2” with control valve and tap 2” from the tap stand to animal trough.
|
job |
1 |
|
|
|
6.8 |
Any other addition(s) proposed by the vendor.
|
|
|
|
|
|
|
Sub-total (6) |
|
|||
|
|
Grand Total* |
|
|||
*The final cost of the work will be adjusted to the actual work done and materials provided, verified, and approved by the CRS field officers.
|
Vender Name: Signature: Date: |
|
Stamp |
Attachment (2)
CRS SUPPLIER CODE OF Conduct
Preamble
This Supplier Code of Conduct is applicable to, and binding upon, all Catholic Relief Services’ suppliers, service providers, and consultants in service to CRS.
CRS is committed to the Code of Conduct and suppliers are expected to comply with these regulations, except when donor requirements, such as the UN Supplier Code of Conduct, supersede this code. Consequently, ethical business standards shall govern all transactions. Suppliers must be aware of situations and circumstances requiring prudent action, including the following:
Forced Labor: CRS expects its suppliers to prohibit forced, bonded and involuntary prison labor. Suppliers shall not require workers to lodge “deposits” or their identity papers with their employer or any recruiting agency. Workers shall be free to leave their employer at any time, given reasonable notice.
Child Labor: CRS expects that its suppliers do not recruit or employ children, as defined by the law of the country or countries where work takes place. Suppliers shall not employ children under age 18 at night or subject them to hazardous working conditions.
Fair Wages: CRS expects that its suppliers pay wages and benefits that meet, at a minimum, national legal standards or industry benchmark standards. Suppliers shall pay wages in legal tender and in regular intervals. Deductions from wages shall only be permitted under conditions and to the extent prescribed by the applicable law, regulations or collective agreements. Suppliers are expected to inform their workers of such deductions at the time of each payment. Suppliers are expected to provide all workers with written and understandable information about their employment conditions in respect to wages, before they enter employment.
Working Hours: CRS expects that the working hours provided by suppliers comply with national laws and collective agreements. Overtime work should be voluntary.
Healthy, Safe and Hygienic Conditions: CRS expects that its suppliers ensure that all working and, where applicable, living environments are safe and healthy. Suppliers are expected to take adequate steps to prevent accidents and injury to health arising out of, associated with, or occurring in the course of work. Suppliers should provide access to clean toilet facilities and potable water, and, if appropriate, sanitary facilities for food storage.
Anti-Discrimination: CRS expects that its suppliers do not discriminate in hiring, compensation, access to training, promotion, termination or retirement on the basis of race, class, national origin, religion, age, disability, sex, or political affiliation.
Freedom of association and right to employee representation: CRS expects its suppliers to recognize workers’ right to freely form and join organizations of their own choosing.
Harsh or Inhumane Treatment: CRS expects that its suppliers do not subject employees to physical abuse or discipline, the threat of physical abuse, sexual or other harassment and verbal abuse or other forms of intimidation.
Environment: At minimum, CRS expects its suppliers to comply with all applicable laws and regulations relating to environmental impact. Suppliers, wherever possible, are expected to support a precautionary approach to environmental matters and undertake initiatives to promote greater environmental responsibility.
Where speed of deployment is essential in saving lives, CRS will purchase necessary goods and services from the most appropriate available source.
The supplier shall not offer, promise, or attempt to influence CRS employees in the procurement of goods and services.
I have carefully read CRS’ Supplier Code of Conduct and understand it. I am aware that any deviations to the ethical standards listed above are not allowed in any procurement transactions. Failure to abide by supplier code of conduct may constitute breach of my contract with CRS, and my signature below acknowledges my understanding and agreement.
I understand and confirm that no personnel of CRS have received or will be offered any direct or indirect benefit arising from any agreements I sign with CRS
Company Name:-----------------------------------------------------
Representative Name and Signature:------------------------------------------------------------
Date