|
We work with organizations around the world to help poor and vulnerable people overcome emergencies, earn a living through agriculture and access affordable health care.
Name of Tender: Rehabilitation/construction of market in Gala Alnahal and Alfashaga localities under Nama project Note: Subject to Donor approval.
Tender Number CRS-RFQ-GAD-SD 2980-2024
Opening submission date: 24 October 2024
Deadline Submission date: 08 November/2024 – 04 :00 PM
Please submit your bid to CRS Gadarif office, Elsalamabi area or through email: tenders.sudan@crs.org |
اسم العطاء: إعادة تأهيل سوق السمك في محلية قلع النحل وإنشاء سوق في منطقتي الفشقة ضمن مشروع نما - ولاية القضارف ملحوظة: تنفيذ العطاء يخضع لموافقة الجهة المانحة
رقم العطاء CRS-RFQ-GAD-SD2980-2024
تاريخ فتح التقديم: 24 October 2024
تاريخ انتهاء التقديم 08 November 2024- 4:00
الرجاء ارسال عرضكم الي مكتب الاغاثة الكاثلوكية القضارف حي السلامابي جوار سوبرماركت المستشار اوعن طريق الايميل الالكتروني tenders.sudan@crs.org |
Dear Sir / Madam, CRS-USCCB Sudan Program is looking for traders/businesses/Farmers’ groups/SMEs to provide the items/services shown in Attachment 1 (Scope of Work) at a competitive price and with high quality.
CRS Requirements
quantity offered, at the unit prices offered, unless the Bidder specifies otherwise in the offer.
|
سيدي / سيدتي العزيز(ة) منظمة الاغاثة الكاثولوكية في السودان تبحث عن شركات لتوفير المواد / الخدمات الموضحة في المرفق 1 باسعار منافسة وجودة عالية.
المتطلبات العامة:
3.متطلبات CRS العامة:
17. نظرًا للحجم الكبير من الاتصالات، فلن نقوم بإصدار تأكيد استلام العطاءات.لى خلاف ذلك في الجدول، لا يجوز تقديم العروض لكميات أقل من تلك المحددة. تحتفظ CRS بالحق في منح أي بند لكمية أقل من الكمية المعروضة، بأسعار الوحدة المعروضة، ما لم يحدد مقدم العرض خلاف ذلك في العرض.
|
Payment Terms
|
شروط الدفع
|
Acceptance of Payment Terms Do you accept the above payment terms?
|
الموافقة على شروط الدفع: هل توافق على شروط الدفع اعلاه:
|
Requested Information The submission must include:
|
يجب تقديم ما يلي: يجب ان يتضمن التقديم ما يلي :
ملف تعريف الشركة التجاري.
|
Bid Requirements
Offers that do not meet the following will be automatically rejected regardless of price:
|
معلومات ملء العطاء سوف يتم رفض أي عطاء لا يلتزم بالشروط أدناه بغض النظر عن السعر:
يجب أن تكون العروض كاملة من جميع الجوانب، موقعة بتاريخ واضح ومختومة على جميع الصفحات.
|
Delivery Instructions: Complete and stamped and signed offer can be submitted directly to CRS Gadarif office salamabi Area near Almustashar supermarket or through email: tenders.sudan@crs.org
|
تعليمات التسليم: يجب تقديم العطاء الكامل في ظرف مغلق و مختوم في صندوق العطاءات في مكتب القضارف حي السلامابي جوار سوبرماركت المستشاراو عن طريق الايميل الالكتروني
|
Experience Reference List
قائمة مراجع الاعمال السابقة
Name of Organization أسم المنظمة |
Name of Person أسم الشخص |
Name of Project أسم المشروع |
Project Start Date تاريخ المباشرة بالمشروع |
Project duration مدة تنفيذ المشروع |
Phone Number رقم الموبايل |
Email Address البريد الالكتروني |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name of the business/company/Farmer Organization: أسم الشركة : |
|
Legal address: العنوان الثابت: |
|
Telephone Number: رقم الهاتف: |
|
Email: عنوان البريد الإلكتروني: |
|
Representative Name and Title اسم الممثل: |
|
Business Certificate Registration Number: رقم تسجيل شهادة العمل: |
|
Tax registration Number if any: رقم التسجيل الضريبي: |
|
Contract duration: مدة العقد : |
|
Bank details (as per the Attached Bank Details sheet- Annex II):
Bank account name:
|
تفاصيل الحساب: اسم الحساب
|
Do you have partnerships with any other companies/farmer groups/SMEs (such as shared management / staff / office / bank account)? Do you cooperate with any other companies in preparing offers or providing of goods or services? هل لديك شراكات مع أي من الشركات الأخرى ( مثل إدارة / الموظفين / المكتب حساب مشترك / البنك) ؟ هل تتعاون مع أي من الشركات الأخرى في إعداد العروض أو توفير السلع أو الخدمات؟ |
|
If the answer for previous question is yes, please provide details here including the names of partner companies. إذا كان الجواب عن السؤال السابق نعم ، يرجى تقديم التفاصيل هنا بما في ذلك أسماء الشركات الشريكة |
|
Other comments: ملاحظات اخرى: |
|
Experience / references for the related work of experience (Please attached any related contract, purchase order, certificate, etc.). References MUST include contact information. يجب ان يحتوي على عناوين الاتصال من مراجع الخبرة المرجع من الخبرة ( الرجاء ارفاق دليل من الاعمال السابقة ذات الصلة من عقود , اوراق شراء , ورقة اتمام عمل , اخرى ) لا تتجاوز عشرة اوراق. |
|
Signature التوقيع |
|
Date التاريخ |
|
Attachment 1 SCOPE OF WORK
Scope of Work
Background and Rationale:
The project aims to address the specific needs and gaps in the Alfshaga fish market infrastructure and operations. And Gala Alnahal locality meet and vegetable market. The soft components focus on improving waste management and hygiene, while the hard components target necessary structural upgrades and rehabilitation. This is planned to be completed within 45 days and the primary beneficiaries are the fish, meat, and vegetable traders.
Major implementation outline:
Geographical Scope:
The project activities will be implemented in the
Implemented Activities:
Hard Component:
Target beneficiaries
Stakeholders:
The key stakeholders for this project are the fish, meat, and vegetable traders, local committee, as well as the local community.
Technical specification narration:
Determine the local market prices for labour and materials for the Alfshaga fish market rehabilitation, First, conduct market research by reaching out to local construction companies, hardware stores, and material suppliers to inquire about their current prices for labour, construction materials, equipment, and other relevant items.
conduct site visits and surveys. Visit the Alfshaga fish market and galaelnahal sites and talk to local vendors, workers, and suppliers. Observe the current market conditions, infrastructure, and materials used to get a firsthand understanding of the local context. This can help you validate the information gathered from other sources and refine your cost estimates.
Lastly, consider inflation and escalation. Adjust your cost estimates to account for any expected inflation or price escalation between the time of research and the start of the rehabilitation activities. This will help ensure your budget remains accurate and relevant.
By using a combination of these strategies, you can develop a more comprehensive understanding of the local market prices for labour and materials in both areas, which will be crucial for preparing an accurate and reliable bill of quantities for both market rehabilitation activities.
Hard Component intervention Details:
Table 1: Supply quantities needed per beneficiary
BOQ and Technical structural Specifications (1)
Market structure rehabilitation – Galaa Alnahal
Item |
Description |
Unit |
Quantity |
Unit C/USD |
Total USD |
Butchery truss rehabilitation |
|||||
1 |
Supplying and closing the sides of the gable, one meter high from the top (mirrors) with 0.35mm local zinc, and square pipes, with doing everything necessary, according to the instructions of the supervising engineer. |
m2 |
50 |
||
2 |
Supply and paint the zinc roof from the inside according to the instructions of the supervising engineer. |
m2 |
115 |
||
3 |
Review the ceiling (zinc) and do what is necessary according to the instructions of the supervising engineer |
practical |
1 |
||
4 |
Supply and installation of domestic for the gable walls from the inside and outside according to the instructions of the supervising engineer. |
m2 |
180 |
||
5 |
Removing and scraping the old whitewash, restoring the wall, supplying and applying whitewash with 1:8 cement mortar with good spraying. |
m2 |
90 |
||
6 |
Removing a wall 1 meter high and 3 meters long inside the gable. |
practical |
1 |
||
7 |
Supply and installation of a ramp door entrance (sliding) with a suitable slope |
practical |
3 |
||
8 |
Supplying and making sheet metal for the gable door with a height of one meter, from the bottom, and making the paint maintenance, and everything required for the door (lock - handles) according to the instructions of the supervising engineer. |
number |
2 |
||
9 |
Supply, installation and connection of a 4- inch pipe along the gable and connecting it to the manhole outside at a suitable, slope according to the instructions of the supervising engineer |
ml |
20 |
||
10 |
Supply, manufacture and delivery of a pipe with a lock on top of the pipe with a skewer, expansion and rough ant measuring (0.3*0.3) meters |
number |
5 |
||
11 |
Maintenance and restoration of the existing manhole, connecting it to the suction cup, making the cover from iron and sheet metal, closing it well, and doing everything necessary according to the instructions of the supervising engineer |
practical |
1 |
||
12 |
Digging, making and connecting a meter sucker and supplying (2*2*2) crushed bricks with making a zinc cover for the sucker |
practical |
1 |
||
13 |
Supply, installation and delivery of a liter water tank with a height of 1.5 1000.metres with a 2.5 angle bracket Connecting a pipe and doing everything necessary to fix and secure the base and tank according to the instructions of the supervising engineer. |
number |
1 |
||
14 |
Removing old ceramic tiles from the gable |
m2 |
30 |
||
15 |
Supplying and installing first-class ceramic tiles for floors and on the platform inside the gable, with good watering according to the instructions of the supervising engineer. |
m2 |
70 |
||
16 |
Supply and paint the expansion on the bench from the inside and outside |
m2 |
70 |
||
17 |
Supply and installation of iron posts and gable scissors |
number |
8 |
||
18 |
Restoration and whitewashing of the external floor deck around the building. |
ml |
50 |
||
19 |
Supply and installation of a sign bearing, the name of the project and the donor and printing of the logo on the gable wall according to the instructions of the supervising engineer |
number |
1 |
||
Subtotal USD |
|||||
Vegetable truss |
|||||
1 |
Supply and installation of an entrance door for the gable (1.5*2) meters made of iron, sheet metal, and square pipes, 1 mm thick for the ring and (6*3) (4*8) for the leaf, and everything that needs to be done according to the instructions of the supervising engineer |
number |
2 |
||
2 |
Supply and construction of a door entrance (staircase) of red brick with cement mortar, with plaster and everything necessary to be done, and the other, entrance from a ramp according to the instructions of the supervising engineer. |
practical |
2 |
||
3 |
Supplying and applying 1:8 cement mortar for the gable walls from the inside and outside, along with scraping and removing the old whitewash and spraying well |
m2 |
90 |
||
4 |
Supplying and closing the sides of the gable from the top (mirrors) with zinc |
m t |
35 |
||
5 |
(local) 0.35m with the, work of the supports and painting them with paint and everything that needs to be done according to the instructions of the supervising engineer 5 mm mesh wire to close the sides of the gable at a height of one meter above the platform. With painting with paint according to the instructions of the supervising engineer |
m2 |
22 |
||
6 |
Supply and installation of first-class ceramic tiles for floors and top (50*50) of the platform. With the installation of white cement for the floors and the color according to the instructions of the supervising engineer |
m2 |
70 |
||
7 |
Supply and installation of zinc paint for the gable roof from the inside and the gables from the inside and outside according to the instructions of the supervising engineer |
m2 |
90 |
||
8 |
Supply and installation of paint for the lists and scissors for the gable |
number |
5 |
||
9 |
Supply and installation of internal and external pomastic for gable walls |
m2 |
85 |
||
10 |
Supply and work of rough grille, external openings Supply and work of rough ant and paints for the openings from the inside meters (0.6*0.25) |
number |
12 |
||
11 |
Supply and fill with improved soil around the gable, one meter away from the wall, at a height of0.5 m, with a slope in good layers and level |
number |
8 |
||
13 |
Supply and make a sign bearing the name of the project and the donor, and print the organization’s logo on the gable wall according to the instructions of the supervising engineer |
number |
1 |
||
Sub total |
|||||
Vegetable suspended flat slab |
|||||
1 |
Supply and whitewash with cement mortar, apply 8:1 gum on the surface of the platform, and perform, restoration, maintenance and everything necessary according to the instructions of the of supervising engineer |
m2 |
80 |
||
Sub total |
|||||
Total |
|||||
Grand Total |
|||||
Amount in words (-----------------------------------------------------------------------------------------------------------------------------------------------------)
BOQ and Technical structural Specifications (2)
Market structure construction - Alfashaga
items |
Description |
Unit |
Quantity |
U/USD |
Total Cost USD |
|
Fish markets Truss + office + store + bathroom |
||||
|
Excavation and backfilling works |
||||
1.1 |
Planning and cleaning |
practical |
1 |
|
|
1.2 |
Digging a 40*40cm strip foundation for truss, the office and the warehouse |
M/T |
40 |
|
|
1.3 |
dig a hole for Wc: Size 100cm*100cm*300cm, 3 holes with 3 barrels |
M3 |
9 |
|
|
1.4 |
Putting the rest of the excavated soil on the site |
M3 |
10.25 |
|
|
1.5 |
Prepare the earthen backfill work with spraying and good tamping every 20 cm |
M3 |
16.8 |
|
|
|
Sub total |
|
|||
|
Regular concrete works |
||||
2 |
Regular concrete works: Supply and pour regular concrete (6:3:1) with a thickness of 10 cm, spraying it well with water, for the following: |
||||
2.1 |
White concrete 1:3:6 thickness 10 cm for truss, office and warehouse |
m2 |
84 |
|
|
2.2 |
White concrete 1:3:6 for foundations |
M3 |
0.716 |
|
|
2.3 |
White concrete 1:3:6 for bathroom floor |
m2 |
9.75 |
|
|
|
Sub total |
|
|||
|
Reinforced concrete works |
||||
3 |
Reinforced concrete works: Supply and pour 4:2:1 reinforced concrete according to the specifications mentioned in the structural design drawing for the following:
|
||||
3.1 |
Supply and pour concrete fora WC measuring 150cm * 450cm * 15cm
|
practical |
1 |
|
|
|
Sub total |
|
|||
|
Building works |
||||
4 |
Building works: Supplying and, constructing red brick buildings provided that the bricks are of one size and have flat surfaces with 6:1 cement mortar, spraying well with water, for the following: |
||||
4.2 |
Building a brick story with 30 cm high walls |
M/T |
40 |
|
|
|
Sub total |
|
|
|
|
5 |
Painting works |
||||
|
A banner measuring 100 cm wide by 200 cm high, designed to display the logo and name of an association. The banner aims to promote the association and its activities. |
number |
1 |
|
|
|
Sub total |
|
|
|
|
Plumbing works |
|||||
6 |
Prepare according to the specifications in the plans, including all elbows, fittings, valves, and joints, for the following: |
||||
6.1 |
Insulation of washing |
Number |
4 |
|
|
6.2 |
Insulation of water tank 1000 liter |
number |
1 |
|
|
6.3 |
Building of semi sabtek (monohle) 120 cm * 100 cm |
number |
1 |
|
|
6.4 |
Make a brikage water suction system (masas system) (150* 150* 200) cm |
Process |
1 |
|
|
|
Sub total |
|
|
|
|
|
Welding work |
||||
7 |
welding works: Supplying and making a ceiling according to the design and, extensions, square pipes 4 x 8, thickness 1.5, every 80 cm mm scissors and square pipe tensioners 5 x 10, thickness 1.5 mm, thermal, insulation brushes, local zinc thickness 0.35, cap, connection with nails, welding work, coating, moisture insulation, slippery, and everything necessary for the following: |
||||
7.1 |
A section of the roof of truss |
1 |
122 |
|
|
7.2 |
Slice of sides of X-Panda 100 cm high |
1 |
40 |
|
|
7.3 |
American zinc side panel 100cm high |
M/T |
80 |
|
|
7.4 |
Square pipe columns 5 x 10, 1.5 mm thick, 3 m high |
number |
10 |
|
|
7.5 |
Making drawers from angles and, sheet metal under the bench for sale size 75 x 150 x 90 cm, with ceramic work on the surface |
number |
16 |
|
|
7.6 |
Bathroom ceiling explanation |
m2 |
8 |
|
|
|
Sub total |
|
|
||
|
Doors and windows work |
||||
8 |
Doors and windows work: Supply and installation of doors and windows made of 4 x 8 square pipes, 1.5 mm, thick, 3 x 6 rings, 1.5 mm thick internal joints and sheet metal with mm thick paint, Turkish or Italian 0.07 handles, fiberglass window skylights. And everything needed |
||||
8.1 |
Explanation of the door 80*220 cm |
number |
3 |
|
|
8.2 |
Installation of a sliding door that opens upwards, size 200 cm * 250 cm |
number |
1 |
|
|
|
Sub total |
|
|||
|
Total for Market rehabilitation |
|
|||
|
|
||||
|
Total cost for Market rehabilitation |
|
Amount in words (-------------------------------------------------------------------------------------------------)
Market structure construction - Alfashaga |
|
Market structure rehabilitation – Galaa Alnahal |
|
Grand Total USD |
|
Amount in words (------------------------------------------------------------------------------------------------)
Drawing: