Sorry
Bid Closed
[ Back ]



Rehabilitation/construction of market in Gala Alnahal and Alfashaga localities under Nama project
Catholic Relief Services

We work with organizations around the world to help poor and vulnerable people overcome emergencies, earn a living through agriculture and access affordable health care.

 

 


 Bid No: CRS-RFQ-GAD-SD2980-2024
 City: Khartoum
 Deadline: 08 Nov 2024
 Description:

Name of Tender:

Rehabilitation/construction of market in Gala Alnahal and Alfashaga localities under Nama project

Note: Subject to Donor approval.

 

Tender Number CRS-RFQ-GAD-SD 2980-2024 

 

Opening submission date:

24 October 2024

 

Deadline Submission date:

08 November/2024 – 04 :00 PM

 

Please submit your bid to CRS Gadarif office, Elsalamabi area or through email: tenders.sudan@crs.org

اسم العطاء:

إعادة تأهيل سوق السمك في محلية قلع النحل وإنشاء سوق في منطقتي الفشقة ضمن مشروع نما - ولاية القضارف

ملحوظة: تنفيذ العطاء يخضع لموافقة الجهة المانحة

 

رقم العطاء  CRS-RFQ-GAD-SD2980-2024

 

 تاريخ فتح التقديم:

 24 October 2024

 

تاريخ انتهاء التقديم

08 November 2024- 4:00  

 

الرجاء ارسال عرضكم الي مكتب الاغاثة الكاثلوكية القضارف حي السلامابي  جوار سوبرماركت المستشار اوعن طريق الايميل الالكتروني tenders.sudan@crs.org

Dear Sir / Madam,

CRS-USCCB Sudan Program is looking for traders/businesses/Farmers’ groups/SMEs to provide the items/services shown in Attachment 1 (Scope of Work) at a competitive price and with high quality.  

 

CRS Requirements

  1. Must Be Registered to conduct the business and in compliance with federal government tax regulations in Sudan.
  2. Experience in supplying International Organizations, Non-Governmental Organizations, or large private companies in East  Darfur will be an advantage.
  3. Must have not declared or be in the process of declaring bankruptcy and have an acceptable track record and uninterrupted business operations for at least 1 year. Supporting documentation will be required to submit.
  4. Have not been convicted for an offense concerning professional conduct.
  5. Have the capacity, operational personnel, and capital to provide the required services.

 

  1. Must have a proven track record of experience in supplying/ providing similar services to International Organizations, Non-Governmental Organizations including CRS, or large private companies in East Darfur.  
  2. This request for proposals does not obligate CRS to perform any contract, nor does it obligate CRS to pay any costs incurred in preparing the proposals.
  3. The trader must be engaged in input supply, aggregation, output marketing, transportation of agricultural supplies or provision of post-harvest handling solutions.
  4. Must have the capacity to support any of the targeted project Farmer-to-Farmer value chains – groundnuts, sorghum, millet, cowpeas, watermelon, and livestock (goats and sheep), tarpaulins/plastic sheets and storage bags in East Darfur.
  5. The financial proposal must be submitted as per the attached Scope of Work (Annex I).  NOTE: The SOW is subject to change based on Donor approval and actual needs on the ground.  
  6. Are not in situations of conflict of interest (e.g., with primary relationship to family or business relationship to parties on a tender committee or any person in CRS).
  7. CRS retains the right to reject, cancel, negotiate, amend, split and accept any offer, without consideration of the lowest offer. Furthermore, CRS reserves the right to reject all bids, if such action is in the best interest of CRS.
  8. This RFQ does not obligate CRS to execute any contract, nor does it commit CRS to paying any costs incurred in the preparation of the bids.
  9. This is an invitation to traders/businesses/Farmers’ groups/SMEs  and is not a promise or obligation that CRS will contract with the traders/businesses/Farmers’ groups/SMEs through the submitted offers.
  10. Relevant bid committee may request for physical samples of some items during evaluation process of bids.
  11. CRS may ask the bidders for additional information at any time during the solicitation process.
  12. Due to the high volume of communications, we will not issue confirmation of receipt of bids.
  13. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. CRS reserves the right to make an award on any item for a quantity less than the

quantity offered, at the unit prices offered, unless the Bidder specifies otherwise in the offer.

  1. The banking information should be specific and complete as per the attached Bank Information Sheet (Attachment II).
  2. Bidder/Trader is responsible for all resources needed for providing seeds and, on site occurred during this period
  3. Payment will be done after completion of total allocated targets for distribution, verification of distribution list, and submission of the completion report.   
  4. Late submissions, modifications, revisions, and withdrawals of offers: 
    1. Any offer, modification, revision, or withdrawal of an offer received at the CRS office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless otherwise CRS makes any exceptions.
    2. Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers. An offer may be withdrawn in person by a Bidder or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
  5. Those who are having existing and active presence in Gadarif state, are only eligible to apply.

سيدي / سيدتي العزيز(ة)

منظمة الاغاثة الكاثولوكية  في السودان تبحث عن شركات لتوفير  المواد / الخدمات الموضحة في المرفق 1 باسعار منافسة وجودة عالية.

 

 

المتطلبات العامة:

  1. يجب أن يكون مسجلا لإجراء الأعمال التجارية مع ما يتوافق ولوائح الضرائب الحكومية في السودان .
  2. الخبرة في توفير الخدمات للمنظمات الدولية، والمنظمات غير الحكومية، أو الشركات الكبيرة الخاصة ستكون ميزة.

 

3.متطلبات CRS العامة:

  1. يجب ألا يكون قد أعلن عن إفلاسه أو في عملية إعلان الإفلاس ويجب أن يكون لديه سجل حافل وعمليات تشغيل تجارية غير منقطعة لمدة عام على الأقل مطلوب تقديم المستندات الداعمة.

 

 

  1. يجب أن لا يكون قد أدين بجريمة تتعلق بالسلوك المهني.

 

  1. يجب أن يكون لديه القدرة والموظفين التشغيليين ورأس المال لتقديم الخدمات المطلوبة.

 

 

  1. يجب أن يكون لديه سجل حافل من الخبرة في توريد/تقديم خدمات مماثلة للمنظمات الدولية، والمنظمات غير الحكومية، أو الشركات الكبيرة الخاصة. سيكون ذلك ميزة إضافية.
  2. لا يجوز أن يكونوا في حالات تضارب المصالح (على سبيل المثال، مع العلاقة الرئيسية مع العائلة أو العلاقة التجارية مع الأطراف في لجنة العطاء أو أي شخص في CRS).
  3. تحتفظ CRS بالحق في رفض، إلغاء، التفاوض، تعديل، تقسيم، وقبول أي عرض، دون النظر إلى العرض الأدنى. علاوة على ذلك، تحتفظ CRS بحق رفض أي وجميع العروض إذا كانت هذه الإجراءات تعتبر في مصلحة CRS.

 

  1. هذا الطلب للعروض لا يلزم CRS بتنفيذ أي عقد، ولا يلزم CRS بدفع أي تكاليف تكبدت في إعداد العروض.

 

  1. هذه دعوة للموردين وليست وعدًا أو التزامًا من CRS بتعاقد مع الموردين من خلال العروض المقدمة.

 

  1. قد يطلب اللجنة المختصة طلب عينات فعلية من بعض العناصر أثناء عملية تقييم العروض.
  2. قد يطلب CRS من المقدمين للعروض تقديم معلومات إضافية في أي وقت خلال عملية الطلب.
  3. نظرًا لارتفاع حجم التواصل، لن نصدر تأكيداً بتلقي العروض.

 

 

  1. يجب أن يقدم المقاول خطة العمل مع حزمة العطاء.

 

  1. يرجى مراجعة الرسم المرفق. ملحوظة: قد يتغير الرسم بناءً على موافقة الجهة المانحة.

 

  1. يجب أن تكون معلومات البنك واضحة ومحددة وفقا" للمرفقات

 

  1. يجب على المقاول تحديد نسبة العمالة المحلية بحيث تكون بنسبة 60%  على الاقل - التي يعتزم توظيفها خلال أعمال الترميم.

 

  1. يجب توفير فترة الصيانة/ضمان العيوب لمدة 12 شهرًا من تسليم البناء. المقاول مسؤول عن جميع الموارد اللازمة لإصلاح جميع الأضرار التي تحدث خلال هذه الفترة (ما عدا القوة القاهرة). ستحتفظ CRS بنسبة 10% من المدفوعات الإجمالية كضمان (أموال احتفاظ) خلال هذه الفترة. 

 17. نظرًا للحجم الكبير من الاتصالات، فلن نقوم بإصدار تأكيد استلام العطاءات.لى خلاف ذلك في الجدول، لا يجوز تقديم العروض لكميات أقل من تلك المحددة. تحتفظ CRS بالحق في منح أي بند لكمية أقل من الكمية المعروضة، بأسعار الوحدة المعروضة، ما لم يحدد مقدم العرض خلاف ذلك في العرض.

  1. 19. يجب أن تكون المعلومات المصرفية محددة وكاملة وفقًا لورقة معلومات البنك المرفقة (الملحق الثاني).
  2. 20. مقدم العرض/التاجر مسؤول عن جميع الموارد اللازمة لتوفير البذور، وفي الموقع حدث ذلك خلال هذه الفترة
  3. 21. سيتم الدفع بعد اكتمال الأهداف المخصصة الإجمالية للتوزيع، والتحقق من قائمة التوزيع، وتقديم تقرير الإنجاز.
  4. 22. التأخير في تقديم العروض والتعديلات والمراجعة وسحبها:
    1. أ. أي عرض أو تعديل أو مراجعة أو سحب لعرض تم استلامه في مكتب CRS المحدد في الطلب بعد الوقت المحدد بالضبط لتلقي العروض "متأخر" ولن يتم النظر فيه ما لم تضع CRS أي استثناءات بخلاف ذلك.
    2. ب. يجوز سحب العروض بإشعار كتابي يتم استلامه في أي وقت قبل الموعد المحدد لاستلام العروض. يجوز سحب العرض شخصيًا من قبل مقدم العرض أو ممثله المفوض إذا تم تحديد هوية الشخص الذي يطلب الانسحاب وتوقيعه على إيصال بالعرض قبل الموعد المحدد لاستلام العروض.
  5. 23. أولئك الذين لديهم تواجد قائم وفعال في ولاية القضارف هم المؤهلون للتقدم فقط.

  

Payment Terms

  1. Quotation should remain valid for a period of at least ninety (90) days from the submission closing date.
  2. Payment shall be made via bank transfer preferably through BANKAK Account or bank cheque or wire transfer.
  3. All payments will be made in USD
  4. Payment is processed between 20-30 working days from the date of receiving the correct and accepted invoice.
  5. Payment shall be made upon verification and acceptance of services according to contract Purchase order. Signed Service Completion Form shall be attached to the final invoice.

شروط الدفع

 

  1. يجب أن يظل العرض ساريًا لمدة تصل إلى تسعين (90) يومًا من تاريخ إغلاق التقديم.

 

  1. يتم إجراء الدفع عبر شيك بنكي ؛  تحويل بنكي او حساب بنكك (بنك ألخرطوم).
  2. سيتم معالجة الدفع في غضون  20-30  يوم عمل من تاريخ استلام الفاتورة الصحيحة والمقبولة.
  3. يتم إجراء الدفع بعد التحقق وقبول الخدمات وفقًا لشروط أمر الشراء في العقد. يجب أن يتم إرفاق نموذج استكمال الخدمة الموقع مع الفاتورة.

 

 

Acceptance of Payment Terms 

Do you accept the above payment terms? 

  • Yes 
  • No 

 

 

الموافقة على شروط الدفع: 

هل توافق على شروط الدفع اعلاه: 

  • اوافق  
  • لا اوافق  

Requested Information 

The submission must include: 

  • Full legal address and contact details of the company 
  • Name of company’s official owner and valid copy of his/her ID &/or passport.    
  • Copy of company valid registration certificate.  No expired registration certificate will be accepted.  
  • Copy of Tax Registration Certificate if any. 
  • Reference from previous similar business experience with reference contact information.  
  • Business Profile if available.  
  • Bank account information as per the CRS template as attached (Annex V) 
  • Price list of commodities & other items as per the SOW.
  • The trader must read, sign & stamp the Attachment (2) related to CRS SUPPLIER CODE OF CONDUCT 

يجب تقديم ما يلي:     

 يجب ان يتضمن التقديم ما يلي :                   

  • العنوان الكامل الصحيح وعنوان الاتصال للشركة 
  • اسم صاحب الشركة الرسمي مع  نسخة من البطاقة القومية او جواز السفر. 
  • صورة عن شهادة تسجيل الشركة 
  • صورة عن شهادة التسجيل الضريبي  
  • المرجع من الخبرة في الاعمال السابقة المماثلة و معلومات الاتصال للمرجع 

 ملف تعريف الشركة التجاري. 

  • ملف المهندس المسؤول عن الفريق الذي سيقوم بالأعمال. 
  • النظام الأساسي/لوائح الشركة. 
  • البيانات المالية للشركة المدققة للسنوات الثلاث الماضية. 
  • كشف حساب البنك للستة أشهر الماضية. 
  • دليل على أن المقدم للعطاء لديه موارد مالية كافية، بما في ذلك خطاب ائتمان إن وجد. أو 
  • تقديم رسالة بنكية رسمية تشهد على الأهلية المالية والاستقرار المالي للمقدم  للعرض. 
    • تفاصيل معلومات الحساب المصرفي اذا امكن. 
    • يجب على المقاول قراءة و توقيع و ختم الملحق(2) و الخاص بالقواعد السلوكية التي تنتهجها هيئة الإغاثة الكاثوليكية. 

  

 

Bid Requirements

 

Offers that do not meet the following will be automatically rejected regardless of price:

  1. Offers must be received before the stated deadline.
  2. Offers must include all information requested above.
  3.  Unit prices must be provided for all items mentioned in the SOW. Offers that only include totals will be rejected.
  4. The pricing of each item shall be in USD and the payment will be made in USD to the respective bank account.
  5. Bids must be submitted through either 1) Email address for the bid)tenders.sudan@crs.org(  or 2) CRS Gadarif office Tender Box for receiving bids.
  6. Offers must be clean & clear. The bidder should sign and stamp next to handwritten corrections or corrections made with whiteout. 
  7. Offers must be complete from all sides, signed, dated, and stamped on all pages.

معلومات ملء  العطاء

سوف يتم رفض أي عطاء لا يلتزم بالشروط أدناه بغض النظر عن السعر:

 

  1. سيتم رفض أي طلب يقدم بعد التاريخ والوقت المحدد لقبول العطاءات.
  2. يجب أن تتضمن العروض جميع المعلومات المطلوبة أعلاه.
  3. جميع الاسعار يجب ان تكتب لكل بند أو فقرة على حدة، ويتم رفض العطاءات التي تحتوي على الإجمالي فقط. 
  4. يجب ان يكون تسعير البنود بالدولار الامريكي على ان يتم الدفع بالدولار للمقاول في حالة امتلاكه حساب دولار أو بالجنيه السوداني بما يقابل سعر الصرف اليومي لدى المنظمة في فترة التقديم للصرفية في حالة عدم توفر حساب بنكي بالدولار للمقاول.
  5. سيتم استبعاد العطاء الذي يتضمن خطأ في حسابات جداول الكميات
  6.  يجب تقديم العروض في مكتب المنظمة في القضارف او عن طريق الايمل tenders.sudan@crs.org . يجب تقديم عروض المناقصات المنفصلة بشكل منفصل. قد تتسبب أي مستندات مفقودة في رفض العرض.
  7. يجب تقديم عروض الطلبات المنفصلة بشكل منفصل. قد يؤدي عدم توفر أي وثائق إلى    رفض العرض بأكمله.
  8. العروض يجب أن تكون نظيفة وواضحة، يجب التوقيع والختم في مكان أي تصحيح يدوي أو باستخدام قلم التصحيح الابيض.

 يجب أن تكون العروض كاملة من جميع الجوانب، موقعة بتاريخ واضح ومختومة على جميع الصفحات.

  1. يرجى ملاحظة أن هيئة الإغاثة الكاثوليكية ستقوم بتوقيع عقد طويل الأمد مع الشركة (ات ) الذي سيتم اختياره (هم) حسب أسعار الوحدة , في حين ان الكميات الفعلية سيتم تحديدها  من خلال طلبات الشراء التي سيتم إصدارها  لاحقا" مع الموردين الذين يتم اختيارهم و حسب الاحتياج الفعلي للهيئة.
  2.  

  

Delivery Instructions:

Complete and stamped and signed offer can be submitted directly to CRS Gadarif office salamabi Area near Almustashar supermarket or through email: tenders.sudan@crs.org

 

  1. Complete and stamped and signed offer must be delivered in sealed envelope with tender number on it (CRS-RFQ-GAD-SD2980-2024) 

 

  1. Delivery to CRS Sudan office located in Gadarif Al salamabi Area building No: 108 Near Almustashar supermarket 

  تعليمات التسليم:

يجب تقديم العطاء الكامل في ظرف مغلق و مختوم  في صندوق العطاءات  في مكتب القضارف حي السلامابي جوار سوبرماركت المستشاراو عن طريق الايميل الالكتروني

 tenders.sudan@crs.org

 

  1. يجب ان لا تتجاوز السيرة الذاتية للشركة اكثر من 10 صفحات.

 

  1. يجب تقديم العطاء الكامل والمختوم و الموقع  مع كافة الوثائق المطلوبة في  ظرف مغلق يكتب عليه رقم العطاء (CRS-RFQ-GAD-SD2980-2024)

 

 

  1. ويسلم الى مقر المنظمة في ولابة القضارف مدينة - القضارف حي السلامابي منزل رقم 108 جوار سوبرماركت المستشار   

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Experience Reference List

قائمة مراجع الاعمال السابقة

 

Name of Organization

أسم

المنظمة

Name of Person

أسم الشخص

Name of Project أسم المشروع

Project Start Date تاريخ المباشرة بالمشروع

Project duration مدة تنفيذ المشروع

Phone Number رقم الموبايل

Email Address البريد الالكتروني

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Name of the business/company/Farmer Organization:

أسم الشركة :

 

 

Legal address:

العنوان الثابت:

 

 

Telephone Number:

رقم الهاتف:

 

 

Email:

عنوان البريد الإلكتروني:

 

 

Representative Name and Title

اسم الممثل:

 

 

Business Certificate Registration Number:

رقم تسجيل شهادة العمل:

 

Tax registration Number if any:

رقم التسجيل الضريبي:

 

Contract duration:

مدة العقد :

 

Bank details (as per the Attached Bank Details sheet- Annex II):

 

Bank account name:

  • Bank number
  • Branch:

 

تفاصيل الحساب:

 اسم الحساب

  • رقم الحساب
  • الفرع

Do you have partnerships with any other companies/farmer groups/SMEs (such as shared management / staff / office / bank account)?  Do you cooperate with any other companies in preparing offers or providing of goods or services?

هل لديك شراكات مع أي من الشركات الأخرى ( مثل إدارة / الموظفين / المكتب حساب مشترك / البنك) ؟ هل تتعاون مع أي من الشركات الأخرى في إعداد العروض أو توفير السلع أو الخدمات؟

 

If the answer for previous question is yes, please provide details here including the names of partner companies.

إذا كان الجواب عن السؤال السابق نعم ، يرجى تقديم التفاصيل هنا بما في ذلك أسماء الشركات الشريكة

 

Other comments:

ملاحظات اخرى:

 

Experience / references for the related work of experience (Please attached any related contract, purchase order, certificate, etc.). References MUST include contact information. 

يجب ان يحتوي على عناوين الاتصال من مراجع الخبرة

المرجع من الخبرة ( الرجاء ارفاق دليل من الاعمال السابقة ذات الصلة من عقود , اوراق شراء , ورقة اتمام عمل , اخرى )  لا تتجاوز عشرة اوراق.

 

 

 

 

 

 

Signature

التوقيع

 

Date

التاريخ

 

 

 

 

Attachment 1 SCOPE OF WORK

Scope of Work

Background and Rationale:


The project aims to address the specific needs and gaps in the Alfshaga fish market infrastructure and operations. And Gala Alnahal locality meet and vegetable market. The soft components focus on improving waste management and hygiene, while the hard components target necessary structural upgrades and rehabilitation. This is planned to be completed within 45 days and the primary beneficiaries are the fish, meat, and vegetable traders.

Major implementation outline:

  • Conduct a comprehensive assessment to understand the current challenges and needs of the market in detail plan and develop the Bill of quantities.
  • Engage the local authorities and relevant government agencies to ensure alignment with their priorities and to leverage their resources and support.
  • Develop a detailed monitoring and evaluation plan to track the progress and impact, and to make necessary adjustments during implementation.

Geographical Scope:
The project activities will be implemented in the

  1. Alfshaga locality fish market construction (jabalon) (drawing)
  2. Gala Alnahal locality meat and vegetable market (rehabilitation)

Implemented Activities:

Hard Component:

  • Structural improvements and latrines rehabilitations in fashaga locality.

Target beneficiaries

  • Young market entrepreneurs (fish, meat, and vegetable traders)

Stakeholders:
The key stakeholders for this project are the fish, meat, and vegetable traders, local committee, as well as the local community.

 

 

 

Technical specification narration:

  • The proposed rehabilitation project aims to enhance the infrastructure of fish markets in Fashaga, and galaelnahal locality, ensuring they meet modern standards and facilitate efficient operations.
  • Excavation and Backfilling Works: The initial phase includes planning and cleaning the site, followed by excavation for foundations and necessary structures. This includes digging strip foundations for the truss, office, and warehouse, as well as holes for sanitation facilities.
  • Concrete Works: Regular concrete will be poured for the floor and foundations, ensuring a robust base for the buildings. This involves using a specific concrete mix (6:3:1) for flooring and a reinforced mix (4:2:1) for critical structural elements like the WC.
  • Building Construction: The construction of red brick buildings is planned, utilizing uniform bricks and quality mortar. This will create durable structures that are essential for the market's functionality.
  • Plumbing Works: Comprehensive plumbing systems will be installed, including insulation for washing areas and water tanks, alongside a water suction system designed to manage waste effectively.
  • Welding Works: Structural integrity will be enhanced through welding, including the installation of a roof and side panels using durable materials to ensure longevity and resistance to environmental factors.
  • Doors and Windows Installation: The installation of secure doors and windows will complete the market's infrastructure, providing safety and accessibility for users.
  • Finishing Touches: A banner will be painted to promote the association managing the market, enhancing its visibility and community engagement.
  • The total cost of the project will be calculated, including a 17% VAT, ensuring that all financial estimates are transparent and accountable. This rehabilitation is expected to significantly improve the operational efficiency and safety of the fish markets, benefiting local fish vendors and the community at large.

Determine the local market prices for labour and materials for the Alfshaga fish market rehabilitation, First, conduct market research by reaching out to local construction companies, hardware stores, and material suppliers to inquire about their current prices for labour, construction materials, equipment, and other relevant items.

conduct site visits and surveys. Visit the Alfshaga fish market and galaelnahal sites and talk to local vendors, workers, and suppliers. Observe the current market conditions, infrastructure, and materials used to get a firsthand understanding of the local context. This can help you validate the information gathered from other sources and refine your cost estimates.

Lastly, consider inflation and escalation. Adjust your cost estimates to account for any expected inflation or price escalation between the time of research and the start of the rehabilitation activities. This will help ensure your budget remains accurate and relevant.

By using a combination of these strategies, you can develop a more comprehensive understanding of the local market prices for labour and materials in both areas, which will be crucial for preparing an accurate and reliable bill of quantities for both market rehabilitation activities.

 

 

Hard Component intervention Details:

  1. Fish Gathering Market: Alfashaga locality
  • Replace the old wood gathering with metal jabalon (attached drawing)
  • Water and sanitation facilities
  • Install or upgrade the water supply and drainage system to maintain cleanliness and hygiene.
  • Provide adequate handwashing stations and toilet facilities for the vendors and customers.
  1. Meat and vegetable Market: Gale Alnahal locality
  • renovate the structure to create a dedicated space for the meat vendors.
  • Ensure the design incorporates necessary features for meat handling, such as proper ventilation, temperature control, and drainage.
  • Consider incorporating partitions or barriers to separate different types of meat.
  1. Water and sanitation facilities
  • Install or upgrade the water supply and drainage system to maintain cleanliness and hygiene.
  • Provide adequate handwashing stations and cleaning facilities for the vendors.
  • Establish a dedicated waste collection and disposal system to handle the disposal of animal waste and other meat-related waste.
  • Provide clearly marked waste bins and encourage proper waste segregation.

 

 

 

 

 

 

 

 

 

Table 1: Supply quantities needed per beneficiary

BOQ and Technical structural Specifications (1)

Market structure rehabilitation – Galaa Alnahal

Item

Description

Unit

Quantity

Unit C/USD

Total USD

Butchery truss rehabilitation

1

Supplying and closing the sides of the gable, one meter high from the top (mirrors) with 0.35mm local zinc, and square pipes, with doing everything necessary, according to the instructions of the supervising engineer.

m2

50

   

2

Supply and paint the zinc roof from the inside according to the instructions of the supervising engineer.

m2

115

   

3

Review the ceiling (zinc) and do what is necessary according to the instructions of the supervising engineer

practical

1

   

4

Supply and installation of domestic for the gable walls from the inside and outside according to the instructions of the supervising engineer.

m2

180

   

5

Removing and scraping the old whitewash, restoring the wall, supplying and applying whitewash with 1:8 cement mortar with good spraying.

m2

90

   

6

Removing a wall 1 meter high and 3 meters long inside the gable.

practical

1

   

7

Supply and installation of a ramp door entrance (sliding) with a suitable slope

practical

3

   

8

Supplying and making sheet metal for the gable door with a height of one meter, from the bottom, and making the paint maintenance, and everything required for the door (lock - handles) according to the instructions of the supervising engineer.

number

2

   

9

Supply, installation and connection of a 4- inch pipe along the gable and connecting it to the manhole outside at a suitable, slope according to the instructions of the supervising engineer

ml

20

   

10

Supply, manufacture and delivery of a pipe with a lock on top of the pipe with a skewer, expansion and rough ant measuring (0.3*0.3) meters

number

5

   

11

Maintenance and restoration of the existing manhole, connecting it to the suction cup, making the cover from iron and sheet metal, closing it well, and doing everything necessary according to the instructions of the supervising engineer

practical

1

   

12

Digging, making and connecting a meter sucker and supplying (2*2*2) crushed bricks with making a zinc cover for the sucker

practical

1

   

13

Supply, installation and delivery of a liter water tank with a height of 1.5 1000.metres with a 2.5 angle bracket Connecting a pipe and doing everything necessary to fix and secure the base and tank according to the instructions of the supervising engineer.

number

1

   

14

Removing old ceramic tiles from the gable

m2

30

   

15

Supplying and installing first-class ceramic tiles for floors and on the platform inside the gable, with good watering according to the instructions of the supervising engineer.

m2

70

   

16

Supply and paint the expansion on the bench from the inside and outside

m2

70

   

17

Supply and installation of iron posts and gable scissors

number

8

   

18

Restoration and whitewashing of the external floor deck around the building.

ml

50

   

19

Supply and installation of a sign bearing, the name of the project and the donor and printing of the logo on the gable wall according to the instructions of the supervising engineer

number

1

   
 

Subtotal USD

 

Vegetable truss

1

Supply and installation of an entrance door for the gable (1.5*2) meters made of iron, sheet metal, and square pipes, 1 mm thick for the ring and (6*3) (4*8) for the leaf, and everything that needs to be done according to the instructions of the supervising engineer

number

2

   

2

Supply and construction of a door entrance (staircase) of red brick with cement mortar, with plaster and everything necessary to be done, and the other, entrance from a ramp according to the instructions of the supervising engineer.

practical

2

   

3

Supplying and applying 1:8 cement mortar for the gable walls from the inside and outside, along with scraping and removing the old whitewash and spraying well

m2

90

   

4

Supplying and closing the sides of the gable from the top (mirrors) with zinc

m t

35

   

5

(local) 0.35m with the, work of the supports and painting them with paint and everything that needs to be done according to the instructions of the supervising engineer 5 mm mesh wire to close the sides of the gable at a height of one meter above the platform. With painting with paint according to the instructions of the supervising engineer

m2

22

   

6

Supply and installation of first-class ceramic tiles for floors and top (50*50) of the platform. With the installation of white cement for the floors and the color according to the instructions of the supervising engineer

m2

70

   

7

Supply and installation of zinc paint for the gable roof from the inside and the gables from the inside and outside according to the instructions of the supervising engineer

m2

90

   

8

Supply and installation of paint for the lists and scissors for the gable

number

5

   

9

Supply and installation of internal and external pomastic for gable walls

m2

85

   

10

Supply and work of rough grille, external openings Supply and work of rough ant and paints for the openings from the inside meters (0.6*0.25)

number

12

   

11

Supply and fill with improved soil around the gable, one meter away from the wall, at a height of0.5 m, with a slope in good layers and level

number

8

   

13

Supply and make a sign bearing the name of the project and the donor, and print the organization’s logo on the gable wall according to the instructions of the supervising engineer

number

1

   
 

Sub total

 

Vegetable suspended flat slab

1

Supply and whitewash with cement mortar, apply 8:1 gum on the surface of the platform, and perform, restoration, maintenance and everything necessary according to the instructions of the of supervising engineer

m2

80

   
 

Sub total

 
 

Total

 
     
 

Grand Total

 
           

Amount in words (-----------------------------------------------------------------------------------------------------------------------------------------------------)

 

BOQ and Technical structural Specifications (2)

Market structure construction - Alfashaga

 

items

Description

Unit

Quantity

U/USD

Total Cost USD

 

Fish markets Truss + office + store + bathroom

 

 Excavation and backfilling works

1.1

Planning and cleaning

practical

1

 

 

1.2

Digging a 40*40cm strip foundation for truss, the office and the warehouse

M/T

40

 

 

1.3

dig a hole for Wc: Size 100cm*100cm*300cm, 3 holes with 3 barrels

M3

9

 

 

1.4

Putting the rest of the excavated soil on the site

M3

10.25

 

 

1.5

Prepare the earthen backfill work with spraying and good tamping every 20 cm

M3

16.8

 

 

 

Sub total

 

 

Regular concrete works

2

Regular concrete works: Supply and pour regular concrete (6:3:1) with a thickness of 10 cm, spraying it well with water, for the following:

2.1

White concrete 1:3:6 thickness 10 cm for truss, office and warehouse

m2

84

 

 

2.2

White concrete 1:3:6 for foundations

M3

0.716

 

 

2.3

White concrete 1:3:6 for bathroom floor

m2

9.75

 

 

 

Sub total

 

 

Reinforced concrete works

3

 

Reinforced concrete works: Supply and pour 4:2:1 reinforced concrete according to the specifications mentioned in the structural design drawing for the following:

 

3.1

 

Supply and pour concrete fora WC measuring 150cm * 450cm * 15cm

 

practical

1

 

 

 

Sub total

 

 

Building works

4

Building works: Supplying and, constructing red brick buildings provided that the bricks are of one size and have flat surfaces with 6:1 cement mortar, spraying well with water, for the following:

4.2

Building a brick story with 30 cm high walls

M/T

40

 

 

 

Sub total

 

 

 

 

5

Painting works

 

A banner measuring 100 cm wide by 200 cm high, designed to display the logo and name of an association. The banner aims to promote the association and its activities.

number

1

 

 

 

Sub total

 

 

 

 

 Plumbing works

6

Prepare according to the specifications in the plans, including all elbows, fittings, valves, and joints, for the following:

6.1

Insulation of washing

Number

4

 

 

6.2

Insulation of water tank 1000 liter

number

1

 

 

6.3

Building of semi sabtek (monohle) 120 cm * 100 cm

number

1

 

 

6.4

Make a brikage water suction system (masas system) (150* 150* 200) cm

Process

1

 

 

 

Sub total

 

 

 

 

 

Welding work

7

welding works: Supplying and making a ceiling according to the design and, extensions, square pipes 4 x 8, thickness 1.5, every 80 cm mm scissors and square pipe tensioners 5 x 10, thickness 1.5 mm, thermal, insulation brushes, local zinc thickness 0.35, cap, connection with nails, welding work, coating, moisture insulation, slippery, and everything necessary for the following:

7.1

A section of the roof of truss

1

122

 

 

7.2

Slice of sides of X-Panda 100 cm high

1

40

 

 

7.3

American zinc side panel 100cm high

M/T

80

 

 

7.4

Square pipe columns 5 x 10, 1.5 mm thick, 3 m high

number

10

 

 

7.5

Making drawers from angles and, sheet metal under the bench for sale size 75 x 150 x 90 cm, with ceramic work on the surface

number

16

 

 

7.6

Bathroom ceiling explanation

m2

8

 

 

 

Sub total

 

 

 

Doors and windows work

8

Doors and windows work: Supply and installation of doors and windows made of 4 x 8 square pipes, 1.5 mm, thick, 3 x 6 rings, 1.5 mm thick internal joints and sheet metal with mm thick paint, Turkish or Italian 0.07 handles, fiberglass window skylights. And everything needed

8.1

Explanation of the door 80*220 cm

number

3

 

 

8.2

Installation of a sliding door that opens upwards, size 200 cm * 250 cm

number

1

 

 

 

Sub total

 

 

Total for Market rehabilitation

 

 

 

 

 

Total cost for Market rehabilitation

 

 

       Amount in words (-------------------------------------------------------------------------------------------------)

 

Market structure construction - Alfashaga

 

Market structure rehabilitation – Galaa Alnahal

 

Grand Total USD

 

 

        Amount in words (------------------------------------------------------------------------------------------------)

 

 

 

 

 

 

 

 

 

 

 

 

Drawing:

 

      • Attached PDF file

 

 

 








Copyright (c) Sudanbid.com, 2019-2024. All rights reserved