Sorry
Bid Closed
[ Back ]



Construction of latrines set at Taga Health Center in Bau province
ADRA

 

 

ADRA Sudan has been operational in Sudan for over 40 years and currently leads humanitarian assistance efforts in conflict-affected Blue Nile, White Nile and West Darfur States, supporting IDPs, returnees, refugees and host communities. ADRA is also implementing urban programming supporting women projects in Khartoum state.ADRA Sudan’s current areas of programming include food Security and livelihoods, WASH, nutrition, Peace building and Conflict Resolution, Education and protection, with gender Equity and environment mainstreamed.


 Bid No: Ref:0037
 City: Khartoum
 Deadline: 28 Jan 2024
 Description:

                                                                                                                                                           


ADRA Sudan – BN Damazine office

Restoring Access to WASH and Food security in BNR (RAWA)

Invitation to Tender (ITT)

For the Construction of latrines set at Taga Health Center in Bau province

Date: 30/12/2023

ADRA Sudan on behalf of its partners, is inviting qualified contractors and companies to bid for the Construction of latrines set as per the specifications and details set in the tender booklet (BOQ) and design.

Potential and qualified companies and contractors interested in carrying out the construction works can collect tender booklet (BOQ) from ADRA Sudan Damazine office, AL-Riyadh, West to ALSiddiq hotel. Bidders must submit the following documents along with their offers:

  • Certificate of registration
  • The firm of the company profile or owner CV, technical and financial abilities and experiences of similar works implemented by the contractor or the company
  • Valid clearance certificate from Tax and Zakat
  • Bank statement verifying the financial ability of the bidder
  • Recommendation letter from the contractor’s union at state level
  • Guarantee check equivalent to 2% of the total value of the bid or guarantee letter from the bank or insurance company and must be topped up to 60% by the selected bidder

N.B All documents submitted for this tender should be copies (non-returnable)

  • The bids are to be submitted in a sealed and stamped envelope and posted in the tender box located in the organization premises in Damazine AL-Riaydh, near AL-Siddiq hotel
  • Closing deadline: Time 4:00 PM, Date 28/January/2024
  • Offers submitted in other manner than those indicated above will not be considered
  • The offers will be scored and evaluated based on the prices and the documents required to be attached
  • The organization reserves the right to accept the lowest or the highest offer

Contacts for any inquiries:      0913323527

Abdalrahman Abdalrazag

Office manager

ADRA Sudan – Blue Nile Region office

أدرا السودانمكتب النيل الازرق -الدمازين

مشروع استعادة الوصول إلى المياه والصرف الصحي والأمن الغذائي في اقليم النيل الازرق (RAWA)

دعوة لتقديم العطاءات (ITT)

لتشييد مراحيض في مركز صحي طاقا بمحافظة باو

التاريخ: 25/12/2023

ترغب منظمة ادرا السودان مكتب النيل الازرق بالتعاون مع شركائها في طرح عطاء لمقاولين أو شركات مؤهلة لتشييد مراحيض في مركز صحي طاقا وفقًا للمواصفات والتفاصيل المنصوص عليها في كراسة العطاء (BOQ) و التصميم.

يمكن للشركات والمقاولين المحتملين والمؤهلين المهتمين بتنفيذ أعمال البناء الحصول على كراسة العطاء (BOQ) من رئاسة المنظمة بالدمازين حي الرياض غرب فندق الصديق. يجب على مقدمي العروض تقديم المطلوبات التالية مع عروضهم:

  • شهادة تسجيل
  • ملف تعريفي عن المقاول أو الشركة و/أو السيرة الذاتية للمالك والقدرات الفنية والمالية والخبرات في الأعمال المماثلة التي ينفذها المورد أو الشركة
  • شهادة ابراء ذمة سارية المفعول من مصلحة الضرائب والزكاة
  • كشف حساب بنكي يؤكد القدرة المالية لمقدم العطاء
  • توصية من اتحاد المقاولين بالولاية
  • شيك ضمان يعادل 2% من القيمة الإجمالية للعطاء أو خطاب ضمان من البنك أو شركة التأمين ويستكمل حتى 60% لمن يرسو عليه العطاء

 

ملحوظة: جميع المستندات المقدمة لهذا العطاء يجب أن تكون نسخًا (غير قابلة للإرجاع)

  • تقدم العروض في مظاريف مقفولة ومختومة وتوضع في صندوق العطاءات الموجود برئاسة المنظمة بالدمازين الرياض بالقرب من فندق الصديق.
  • الموعد النهائي للتقديم: الساعة 4:00 مساءً ، التاريخ 24/يناير/2024
  • يتم تقييم العطاء استنادا على قيمة العرض والمستندات المطلوب ارفاقها
  • سيتم تقييم العروض وتقييمها بناءً على الأسعار والمستندات المطلوب إرفاقها
  • المنظمة غير مقيدة بقبول أقل او أعلى عرض ويمكن قبول العرضين أو أحدهما ورفض الاخر

للتواصل لأي استفسار: - 0913323527

عبدالرحمن عبدالرازق

   مدير المكتب - أدرا السودانمكتب إقليم النيل الأزرق

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blue Nile State

ADRA Sudan with cooperation with Ministry of Health

ENGINEERING UNIT

Bill Of Quantities

Location : Taga

Health Center Latrine work 4 drop holes

Item

Description

Unit

Qty

Unit price (SDG)

SDG Amount

1

EXCAVATION AND BACKFILL WORK :-

 

 

 

 

 

The excavation is carried out according to the technical specifications and principle of the work that supporting the site of excavation if necessary and remove the excavated soil away from the site.

 

1.1-excavate and dig for analysis tank foundation with dimension 11*3 m and depth 2.7 m

m3

53

 

 

 

1.2-excavate for curtain wall foundation front the building in dimension of 50*50 cm

ml

8

 

 

 

1.3-provide materials and backfill with fine sand at the bottom of analysis tank and curtain wall in thickness 10 cm , spraying water and give agood compaction

m3

2.5

 

 

 

1.4-provide material and backfill with gravel arount the curtain wall and latrine rooms with 40 cm, spraying water and compacted materials well

m3

2.5

 

 

 

Total of excavation work

 

 

 

 

2

CONCRETE WORK :-

 

 

 

                     -  

 

The work is carried out according to the technical specifications and pricicple of the work that include concrete cover (chopping) to give a smoth and clean surface externally and enternally and all materials that necessary for work such as cement, metalic bars ........ etc.

 

2.1.provide materials and build plain concrete of analysis tank and front of latrine rooms 10 cm thickness, mix 1:3:6 

m3

2.1

 

 

 

2.2-provide materials and build rienfoced concrete at base of analysis tank 12 cm thickness and iron steel bars 4 linnee at 15 cmm c/c in two side with mixing 1:2:4

m3

2.52

 

 

 

2.3-provide materials and build rienforced concrete roof for analysis tank 12 cm with iron steel bars 4 linnee in to sides with mixing 1:2:4 and open searching holes with dimension (40*40) cm

m3

3.52

 

 

 

2.4-provide materials and build center beam with dimension (20*15) cm, using steel bars 4 linnee and 2 linnee for cane skewer each 15 cm c/c on mixing 1:2:4

m3

0.61

 

 

 

2.5-provide materials and build rambs in two side from circular pipes 2 inch 1 mm, fixed with plain concrete and build slipway from P.C mixing 1:3:6 after the backfill

m3

1

 

 

 

Total of concrete work

 

 

 

 

3

3-BUILDING WORK :

 

 

 

                     -  

 

the construction is carried out with red bricks number one according to the technical specification and the price includes all materials that conform to specifications and qualities

 

3.1-provide materials and build inside the tank with red brick grade one (1.5 brick) thickness for dimention (6.8*2.8)m and 2.58m high with mixting cement mortar 1:6

m2

84

 

 

 

3.2-provide materials and build with red brick grade one from the base of analysis tank roof with 2.8m high till rooms roof

m2

55

 

 

 

3.3-provide materials and build granet stone strips grade one inside the curtain wall foundation with 50cm high mixing 1:8 cement mortar and wading with fine sand for each layer

ml

8

 

 

 

3.4-provide materials and build with red brick grade one (1.5 brick) thickness for curtain wall 2m high with mixing 1:8 cement mortar

ml

8

 

 

 

3.5-provide materials and build with red brick grade one (1 brick) thickness for curtain wall 2m high with mixing 1:8 cement mortar and price includes plasster internal and external with 1:8 mixing cement mortar

m2

15

 

 

 

Total of building work

 

 

 

 

4

ROOFS WORK :

 

 

 

                     -  

 

The work is carried out according to the technical specifications and pricicple of the work and price includes all the materials necessary such as zink, nails,iron pipes, welding riveting, fastening and painting with anti-rust paint

 

4.1-provide materials and build roof from american heavy zink 0.35mm thickness and 3 purlins from heavy iron pipes 3*6 inch, 1.2mm thickness and the price include painting with anti=rust paint according to technical specifications 

m2

13

 

 

 

Total of roof work

 

 

 

 

5

METALIC WORK :

 

 

 

 

 

the work carried out according to technical specifications and price includes all materials such as heavy rectangular black pipe 3*6 inch, 1.2 thickness for doors and 2.5*5inch, 1.2 thickness for sides

 

5.1-provide materials and install door from sill (0.8*2.00)m from heavy rectangular pipe 1.2mm thickness for frame, and rectangular pipe 2.5*5 inch, 1.2 thickness for sill and leaf the bindding with saudi arabia shed and install exepand for skylight and all necessary materials to complete the work such as blot 8 inch and bolt with external lock, handle, weld, painting, emery and finshing

Num

4

 

 

 

5.2-provide materials and install skylight (40*40)cm from heavy rectangular pipes 1.2 thickness and ornament as skewer net 3 linnee and the price includes fine and rough ANT with painting

Num

4

 

 

 

5.3-provide and install ventilated pipes 4 inch UPVC 10 bar and cover the uper of pipe with fine ANT

Num

2

 

 

 

5.4-provide materials and build with rienforced concrete (45*45)cm for searching holes

Num

2

 

 

 

5.5-provide material and install municipal marble seat (2) and fix Afrangi seat from marble materials in tow rooms for disabilities according to specification

Num

4

 

 

 

Total of metallic work

 

 

 

 

6

PLASSTER WORK :

 

 

 

 

 

All the work is carried out according to the general technical specifications with cement sand mortar and the price include cleaning walls and all areas that need to be plastered

 

6.1-provide materials and set plaster for internal analysis basin with cement mortar 1:6 mixing including cement gum

m2

58

 

 

 

6.2-provide materials and set plaster for latrine rooms and curtain wall 1:8 mixing cement mortar

m2

64

 

 

 

Total of plaster work

 

 

 

 

7

PAINTING WORK :

 

 

 

 

 

All the work is carried out according to the general technical specifications and the price including all materials necessary for the work and all internals angled, crossing and scapula

 

 7.1-provide materials and paint with pomastic three faces internally and externally with silk coating and external emery and cleaning walls by lime hox according to required color

m2

122

 

 

 

Total of painting work

 

 

 

 

 

Total

 

 

 

 

 

Total without VAT

 

 

 

 

 

Grand Total

 

 

 

 

 

the total amount for constructing one school latrine ………………………………………………………

 

………………………………………………………………………………………………………………….

 

 

Timeline for completion

 

 

 

 

 

warring :  specifications and drawings were prepared by the engineering unit

 

 

Ministry of Health

 

 

 

 

 

 

 

 

 

 

 

Total amount in letters ……………………….

 

 

 

 

 

Name: contractor……………………………………..

 

 

 

 

 

Phone:………………………………………………….

 

 

 

 

 

Signature:……………………………………………

Stamp……………………………….

 

 

 

 








Copyright (c) Sudanbid.com, 2019-2024. All rights reserved