|
Sorry | Bid Closed [ Back ] |
ADRA Sudan has been operational in Sudan for over 40 years and currently leads humanitarian assistance efforts in conflict-affected Blue Nile, White Nile and West Darfur States, supporting IDPs, returnees, refugees and host communities. ADRA is also implementing urban programming supporting women projects in Khartoum state.ADRA Sudan’s current areas of programming include food Security and livelihoods, WASH, nutrition, Peace building and Conflict Resolution, Education and protection, with gender Equity and environment mainstreamed.
ADRA Sudan – BN Damazine office
Restoring Access to WASH and Food security in BNR (RAWA)
Date : 15 / 11 / 2023 Invitation to Tender (ITT)
Ref: 0030FY23
For Rehabilition and Bacteriological tests of (18) Hand Pumps in Bau and Kurmuk provinces in ( Magba , Jaigo , Gabanit , Kumreg , Bau , Deglog , Gambarda , Abigo , Dokan ) Villages
ADRA Sudan Organization on behalf of its partners , is inviting qualified contractors and companies to bid for rehabilitation and bacteriological test for (18) hand pumps as per the specifications and details set in the tender booklet (BOQ).
Potential and qualified companies and contractors interested to carry out the Rehabilitation of Hand pumps works can collect tender booklet (BOQ) from ADRA Sudan Damazine office , AL-Riyadh , West to ALSiddiq hotel. Bidders must submit the following documents along with their offers:
N.B All documents submitted for this tender should be copies (non-returnable)
Contacts for any inquiries: 0913323527
Mohamed Hashim Seedahmed
Project Coordinator
ADRA Sudan – Blue Nile Region office
أدرا السودان – مكتب النيل الازرق -الدمازين
مشروع استعادة الوصول إلى المياه والصرف الصحي والأمن الغذائي في اقليم النيل الازرق (RAWA)
التاريخ : 15/ 11/2023م دعوة لتقديم العطاءات (ITT)
لصيانة عدد (18) مضخة يدوية بمحافظتي باو والكرمك في المناطق الاتية (مجبا ، جيقو ، قبانيت ، كمريك ، باو ، دقلوك ، قمبردا ، ابيقو ، دوكان )
ترغب منظمة ادرا السودان مكتب النيل الازرق نيابة عن شركائها في طرح عطاء لمقاولين أو شركات مؤهلة لصيانة عدد (18) مضخة يدوية بمحافظتي باو والكرمك وفقًا للمواصفات والتفاصيل المنصوص عليها في كراسة العطاء (BOQ) .
يمكن للشركات والمقاولين المحتملين والمؤهلين المهتمين بتنفيذ أعمال إعادة تاهيل المضخات اليدوية الحصول على كراسة العطاء (BOQ) من رئاسة المنظمة بالدمازين حي الرياض غرب فندق الصديق. يجب على مقدمي العروض تقديم المطلوبات التالية مع عروضهم:
ملحوظة: جميع المستندات المقدمة لهذا العطاء يجب أن تكون نسخًا (غير قابلة للإرجاع)
للتواصل لأي استفسار: - 0913323527
محمد هاشم سيد احمد
منسق المشروع - أدرا السودان – مكتب إقليم النيل الأزرق
ADRA Sudan Restoring Access to WASH and Food Security in BNS (RAWA)
Suggestion Rehabilitation of Hand pumps in Bau and Kurmuk Province
Date : 14/11/2023
# |
Province |
Village |
Number of Hp |
Code Number |
1 |
Bau |
Magba |
2 |
A1 , A2 |
2 |
Jaigo |
1 |
A3 |
|
3 |
Gabanit |
3 |
A4 , A5 , A6 |
|
4 |
Kumreg |
1 |
A7 |
|
5 |
Bau |
3 |
A8 , A9 , A10 |
|
6 |
Kurmuk |
Deglog |
2 |
A19 , A23 |
7 |
Gambarda |
2 |
A14 , A15 |
|
8 |
Abigo |
2 |
A11 , A13 |
|
9 |
Dokan |
2 |
A25 , A26 |
|
Total |
18 |
|
بسم الله الرحمن الرحيم
منظمة ادرا للتنمية والاغاثة -اقليم النيل الازرق -مكتب الدمازين
مشروع استعادة الوصول للمياه و الاصحاح و الامن الغذائي ( روا ) - اقليم النيل الأزرق
المناطق المستهدفة بالعطاء لاعادة تاهيل عدد (18) مضخة يدوية بمحلفظتي باو والكرمك
مشروع تاهيل مضخات يدوية التاريخ:14/11/2023م
جدول يوضح المناطق المستهدفة : Target Village
رقم الكود |
عدد المضخات |
اسم القرية |
المحافظة |
# |
A1 , A2 |
2 |
مجبا |
باو
|
1 |
A3 |
1 |
جيقو |
2 |
|
A4 , A5 , A6 |
3 |
قبانيت |
3 |
|
A7 |
1 |
كمريك |
4 |
|
A8 , A9 , A10 |
3 |
باو |
5 |
|
A19 , A23 |
2 |
دقلوك |
الكرمك |
6 |
A14 , A15 |
2 |
قمبردا |
7 |
|
A11 , A13 |
2 |
ابيقو |
8 |
|
A25 , A26 |
2 |
دوكان |
9 |
|
|
18 |
الجملـــــــــــــــة |
ADRA Sudan
|
|||||
Restoring Access to WASH and Food Security in BNS (RAWA)
|
|||||
Suggestion Rehabilitation 18 of Hand pumps in Kurmuk and Bau Province |
|
||||
Rehabilitation (18 ) of Hand pumps project |
|
|
|
||
BOQs For Rehabilitation of Hand pumps: |
|
|
|
|
|
# |
Specifications |
Unit |
Qty |
Price per Unit (SDG) |
Total price (SDG) |
|
Rehabilitation of the number of (18) hand pumps: Rehabilitation of the Hand pump and the dismantling of all its internal and external parts and completely change it with all the needs and accessories of the pump to work at its maximum capacity and high efficiency, review the concrete casting and strengthen the drainage system and the livestock drinking basin. |
job |
18 |
|
|
2 |
Use chlorine shocks for all pumps that have been rehabilitated by (300) grams for the pump after rehabilitation of Hand pumps to ensure that the wells of the hand pumps are cleared of any possible contamination, and once the treatment of chlorine shocks is completed the Hand pump well is pumped for 45 minutes and then the work is completed. |
job |
18 |
|
|
3 |
Numbers of (36) bacteriological Hand pump tests were performed for the reality of (2) tests per Hand pump before the Hand pump was rehabilitated and another after the Hand pump was rehabilitated to make sure that there were no fecal coliforms after disinfection. |
test |
36 |
|
|
4 |
Fencing of (18) hand pumps : Provide Materials of Supply and installation of Gabions wire with an opening of 5 cm and thickness of the Gabions wire is 3 mm and wide 150 cm , 2 inches the Steel pipes of iron 2 m high to be fixed 40 cm in the ground with concrete mix 1:2:3 , the supply is from steel rod 4 mm with span 3 lines from steel rod 12 m, the length of the Fencing is 20 meters with the installation of agate with a width of 1 × 1.5 meter , and The floor slap is to be 10 cm thick minimum of concrete and cementing , to activate the necessary inclination so that the water flowing on the floor of the fence is drained and paint the steel pipes and a gate . |
job |
18 |
|
|
|
Total |
|
|||
|
VAT 17% |
|
|||
|
Grand Total |
|
|||
|
Timeline of completion of rehabilitation |
|
|||
|
|
|
|
|
|
Amount in letters :…………………………………………………………..…………………… |
|
||||
…………………………………………………………………………………………………….. |
|
||||
Contractor name: |
Date: |
||||
Tel: |
Signature: |
Stamp: |