ADRA Sudan has been operational in Sudan for over 40 years and currently leads humanitarian assistance efforts in conflict-affected Blue Nile, White Nile and West Darfur States, supporting IDPs, returnees, refugees and host communities. ADRA is also implementing urban programming supporting women projects in Khartoum state.ADRA Sudan’s current areas of programming include food Security and livelihoods, WASH, nutrition, Peace building and Conflict Resolution, Education and protection, with gender Equity and environment mainstreamed.
ADRA Sudan – BN Damazine office
Restoring Access to WASH and Food security in BNR (RAWA)
Invitation to Tender (ITT)
Ref:0029FY23
For Upgrading and rehabilitation of Gabanet Water Yard- Bau province
Date: 15/11/2023
ADRA Sudan on behalf of its partners, is inviting qualified contractors and companies to bid for upgrading and rehabilitation of Gabanet Water Yard as per the specifications and details set in the tender booklet (BOQ)
Potential and qualified companies and contractors interested to carry out the upgrading works can collect tender booklet (BOQ) from ADRA Sudan Damazine office, AL-Riyadh , West to ALSiddiq hotel. Bidders must submit the following documents along with their offers:
N.B All documents submitted for this tender should be copies (non-returnable)
Contacts for any inquiries: 0913323527
Mohamed Hashim Seedahmed
Project Coordinator
ADRA Sudan – Blue Nile Region office
أدرا السودان – مكتب النيل الازرق -الدمازين
مشروع استعادة الوصول إلى المياه والصرف الصحي والأمن الغذائي في اقليم النيل الازرق (RAWA)
دعوة لتقديم العطاءات (ITT)
لإعادة تأهيل محطة مياه منطقة قبانيت بمحافظة باو
التاريخ: 15/11/2023م
ترغب منظمة ادرا السودان مكتب النيل الازرق بالتعاون مع شركائها في طرح عطاء لمقاولين أو شركات مؤهلة لإعادة تأهيل و تطويرمحطة مياه منطقة قبانيت بمحافظة باو وفقًا للمواصفات والتفاصيل المنصوص عليها في كراسة العطاء (BOQ)
يمكن للشركات والمقاولين المحتملين والمؤهلين المهتمين بتنفيذ أعمال التطوير الحصول على كراسة العطاء (BOQ) من رئاسة المنظمة بالدمازين حي الرياض غرب فندق الصديق. يجب على مقدمي العروض تقديم المطلوبات التالية مع عروضهم:
ملحوظة: جميع المستندات المقدمة لهذا العطاء يجب أن تكون نسخًا (غير قابلة للإرجاع)
للتواصل لأي استفسار: - 0913323527
محمد هاشم سيد احمد
منسق المشروع - أدرا السودان – مكتب إقليم النيل الأزرق
Blue Nile State |
|||||
ADRA Sudan with cooperation with Ministry of Infrastructure and urban development |
|||||
Drinking water corporation |
|||||
Bill Of Quantities |
|||||
Location : Gabanit - Bau Province |
|||||
Rehabilitation and Upgrading of Borehole to Water Yard |
|||||
Item |
Description |
Unit |
Qty |
Unit Price (SDG) |
Total price SDG |
|
|
|
|
|
|
1 |
Clear out existing 250ft bore” |
Job |
1 |
|
|
2 |
Provide materials and conduct pumping test for wells till finding good productivity using all the equepment necessary to the work according to DWC specification to determine production, yield, depth and Dynamic Water Level |
Job |
1 |
|
|
3 |
Supply and installation of a 1 ¼ -inch submersible electric pump (stainless steel) with a capacity of (5) m3/h, vertical pressure of 70 m, complete (pipes, cable, drums, etc.) and supply and installation of G.I. Accessories such as tees, elbows and flanges, according to the direction of the supervising engineer and the recommendation of the study and the well test |
Num |
1 |
|
|
4 |
Provide materials and construct elevated steel tank with the following specifications : |
Job |
1 |
|
|
5 |
Supply and installation of a solar energy operating system, including (10 cells x 450 watts, 4500 watts, flip switch, 20 amp breaker, 16 mm cable, 30 meters long, lightning rod, charger and all accessories to complete the control panel |
Job |
1 |
|
|
6 |
Provide and install eruopean diesel engine 18 HP manufacturing or eqivelant complete with accessories (suction pipe,delivery pipe,foot valve) and Motor 10 Kw and (water cool system) of recognized manufacture and type . |
NO |
1 |
|
|
7 |
Rehabilitation of the old existing tank with all its accessories (welding, grilles, painting, and revision of the up and down line) and connection to the new tank according to the specifications and recommendations of the supervising engineer |
Num |
1 |
|
|
8 |
Supply and install invertor European -Made or Equivalent (Micno ) 3 HP and all switches inside switching box, with original circuit breaker of 150 Amps and Hybrid Switch. |
|
|
|
|
9 |
Supply and install Galvanized pipe 1¼ -inch |
Num |
15 |
|
|
10 |
Supply, manufacture and installation of a 4 x 4 m operating room of 36 gauge zinc, heavy 8 x 4 pipes, concrete floor, door and windows, according to the principles of workmanship |
Job |
1 |
|
|
11 |
Provide and install chlorine dosing pump injection and cylinder to disinfect water to consumer with all accessories |
set |
1 |
|
|
12 |
Tap Stand: |
M |
20 |
|
|
13 |
Tap stand: Supply and construct reinforced concrete slab platform 20 cm thick dimensions 4 m x 1m , supported on 3 pillars 0.7m clear high above ground , built from red brick in c/s mortar (1:3) , and tap stand including following :Pipe connection : 3” cast iron control valve, 3” galvanized iron pipe stand for cart filing with 3” cast iron with flexible hose control valve and 3 “ water meter Draining facilities of plain concrete floor 4×1.5×0.1 m under the platform and duct 4×0.3×0.2 m to carry waste water out of the fence and 6 taps of ½ inch, all according to drawing , norms and the directions of the Engineer |
Job |
1 |
|
|
14 |
supply and construct floor slap at the floor of the tap stands, the cost includes 10 cm thick plain concrete slap @ ratio 1:2:4, the cost includes the soil filling and compaction of min 20 cm thick and lay in the 10 cm thick plain concrete slap. |
M² |
24 |
|
|
15 |
7- Provide materials and lay 3 inch HDPE 10 bar to connect elevated tank with to water point including all fittings |
M |
100 |
|
|
16 |
Provide and installing valve 3-inch for control network of water |
Num |
5 |
|
|
17 |
Supply and construct reinforced 10 cm thick concrete slap stand for the tap stand on 30 cm thick red brick wall with c/s mortar. the cost include plaster with C/s mortar 1: 6 and other finishing’s. manholes (80x80x50 cm depth) for gate valve etc , The cost includes, 3'' gate Valve |
Each |
3 |
|
|
18 |
Water animal trough: Supply and Installation of 3-inch, HDPE Pipeline 6 Bars from the raw water delivery line to the location of animal trough 30 m long, with all connection and fittings. The cost includes HDPE (Kasen) 3" and 3 " gate Valve (2 No). The 3-inch and valve is costing more but it helps in fast filling of the animal trough in case of large number of animals especially cows. |
M |
30 |
|
|
19 |
supply and fabrication of 2 basin animal trough, heavy steel 3mm thick with 2-inch angular 4mm for the frame of the animal trough. As specification on the design. The cost including coating with primer min 3 coats and apply gray color coat on top. |
Each |
2 |
|
|
20 |
fencing the facility 15 m ×15 m as stander the tap stand should be fences , Provide Materials and installation gabion Wire with an opening of 5 cm and thickness of the Gabions wire is 3 mm and wide 150 cm for Fencing long 10 m , and erect fence around filter area with poles from heavy iron pipes 2 inch dia and foundation for poles in concrete mix 1:2:3 dimension 40cmx40cmx50 cm and fix erect gate from rectangular iron pipes 4x8 , 3x6 inch width 1.5m and high1.8m per specifications of drawings and according to DWC/WES standard and Engineer instruction, |
M |
60 |
|
|
|
Total |
|
|
|
- |
|
17% vat |
|
|
|
|
|
Total without VAT |
|
|
|
|
|
Timeline for completion |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contractor name: |
Date: |
||||
Tel: |
Signature: |
||||
Stamp: |
|||||