Sorry | Bid Closed [ Back ] |
The Norwegian Refugee Council is an independent humanitarian organisation helping people forced to flee. We work in crises in more than 30 countries, where we help save lives and rebuild futures.
REQUEST FOR QUOTATION
Date: 14 Aug 2022
From:
Norwegian Refugee Council (NRC)
Khartoum Country Office
Contact person: Aseel Alnaw
Position: Procurement Assistant
Email: SD.procurement@nrc.no
Deadline for submission: 18th Aug 2022 @ 04:00 PM
All interested and eligible firms are requested to submit their offers by hand in sealed envelopes submitted to the address specified above or completed tender documents to be sent to electronic tender box sd.tenders@nrc.no
Subject:
Construction of Infiltration Gallery in Um Koaro Village - Al Leri - South Kordofan
Requirements:
The office of the Norwegian Refugee Council invites your company to make a firm offer for the following items:
If you have any enquiries OR wish to schedule a site visit, please contact us at any time.
Annex 1: Scope of work & Building specifications:
Construction of Infiltration Gallery in Um Koaro Village - AL-Leri Locality & Accompanied of One Water Yard and installation of Solar powered pumping system
To reach the standard construction of Infiltration Gallery, tower elevated water tank and water point distribution. All necessary temporary works required to provide access to the site, secure storage of materials and to facilitate construction in a safe manner. All necessary site preparation works including the construction of a concrete foundation, the removal of top soil and subsequent backfilling, and all other ground and works that may be necessary. The Scope of Works shall also be deemed to include anything that is not listed here but may reasonably be inferred to be necessary for the completion of the Works.
Description:
This is a scope of work document for Construction of Infiltration Gallery and accompanied of one water yard and installation of solar powered pumping system, water point distribution, Animal trough, and water irrigation channels in Um Koaro Village - AL-Leri locality - South Kordofan according to the specification and BOQ attached. Contractor shall supply all adequate and competent labours, supervision, tools and, equipment, installed and consumable materials, services, testing devices, and each and every item of expense necessary for Supply management.
Specification
In general, the contractor shall provide and maintain work environments and procedures which will safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities; avoid interruptions of Government operations and delays in project completion dates; and, control costs in the performance of this contract. For these purposes, the contractor shall consider several factors of safety during implementation:
Health & Safety:
Site preparation and planning:
Excavation and foundation work:
Concrete specification for foundation work:
Elevated stand steel foundation for vertical water tank:
Water tanks:
Pipelines:
Pipelines need to be laid: a supply line to convey water from borehole in Infiltration Gallery to the storage reservoir and distribution line to take the water from storage reservoir to the distribution points.
The pipeline needs to be protected to ensure a lifespan of 20 – years. Recommendations for laying pipelines include:-
Galvanized iron (GI) Pipes
GI are usually supplied with tapered threads at the ends with one straight connector per pipe. It is preferable to cut the pipe to length with a pipe cutter rather than hacksaw.
To enable pipes and fittings to be removed for repair, threaded GI pipes should be joined with screwed unions on at least one side of a valve or fitting and in long length (>100m) GI pipes have flinched joints . Flinch dimensions can vary widely so new fitting must be carefully matched to existing pipe work. Ensure that there are sufficient gaskets for each flange joint. GI pipes can be welded, but this should be reserved for critical joints and for making up adaptors and special fitting.
Firmly anchor exposed GI pipes using pipe anchors of steel and concrete .Exposed empty GI pipes can became very hot in a warm and sunny climate. Care must be taken when filling hot pipes with cold water as the sudden contraction can damage threaded joints causing them to leak.
The following precautions should be taken when handling and storing GI pipes:
Installation of submersible pump unit:
Construction of distribution point:
Installation of solar system:
Construction of the Generator room and fencing:
A1) MATERIALS AND WORKMANSHIP
All the work noted in this specification must be carried out to the highest standard which is normally possible, using only the best materials and most skilled workmen. Samples of all construction materials must be shown to a representative of NRC for written approval before starting construction. The contractor should pay his team and NRC will not be answerable to contractor’s failure to meet his contractual obligations with his employees.
A2) SITE IN CHARGE
The CONTRACTOR must employee an experienced site-in-charge who must be on site to supervise the work at all times when work is Generally leave the whole area of the site clean, washed, tidy and ready for use.
The choosing of cement brand must agree with a representative of NRC. All cement brought to the site must be fresh (manufactured within previous three months) and in perfect condition for use. All cement brought to the site must be stored carefully so that it remains in perfect condition. Storage must be a totally dry place with a platform of planks or bamboo to keep all cement 6” minimum height above the ground.
B2) COARSE AGGREGATE FOR CONCRETE
The first choice of coarse aggregate chosen by NRC is graded mountains gravel of suitable type and strength. The second choice of aggregate is broken stone of suitable type and strength. The source of aggregate should be clean and free from impurities and plant material. The shape of the aggregate should be mostly rounded with a small number, which are long or flat. If this type of aggregate is not available the CONTRACTOR must agree with a representative of NRC which other type to use.
B3) SAND
The sand must not contain mud, dust, or pieces of plants. The CONTRACTOR must make all efforts to obtain coarse sand (with zero fines). A sample of sand must be shown to a representative of NRC. For plastering, the sand must be sieved according to the NRC site Engineer’s additional specification.
B4) WATER
Clean water should be used in all construction works especially for plaster or mortar. The CONTRACTOR must inform a representative of NRC as to the source of water used in all construction works.
C) WORKMANSHIP:
C1) CONCRETE WORKMANSHIP
All materials for concrete (cement, sand, aggregate and water) must meet the quality specifications set out in Section B above. The proportions of cement, fine river sand and aggregate must be determined by volume according to the following table:
Concrete Mix (1m3) |
Cement |
River Sand |
aggregate |
1:2:4 |
kg |
m3 |
m3 |
1:3:6 |
kg |
m3 |
m3 |
Water/cement ratio quantity of water must not to exceed the following:
Concrete Mix |
Amount of water |
1:2:4 |
32 litres per 50kg cement |
1:3:6 |
25 litres per 50kg cement |
C2) WELDING WORKMANSHIP
Annex 2: Construction of Infiltration Gallery in Um Koaro Village - Al Leri - South Kordofan |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
2- IMPORTANT NOTE:
You can use the above table
OR you can print your quotation on your own letter-head documents.
Your quotation shall be printed, signed and stamped.
Don’t forget to include your company name, address, contact details as well as your tax number.
Prices must include VAT (in prices or in total).
If different taxes & fees apply, please specify them all in your quotations and include them all.
Important Remarks:
Warranty period & Defect liability guaranty:
A warranty period of 120 days will be observed. This period will start the day following the reception of the completed work. During the warranty period, the contractor will be obliging to resolve / correct all defects notified to him by NRC.
10% of the total value of the contract will be retained by NRC to cover the warranty period.
The retained amount will be paid once all defects (if any) have been corrected, and within 15 days after the end of the warranty period in case no defects were notified to the contractor.
3 - Please answer the questions:
Questions |
Answers |
What is the currency of the offer? (SDG, USD, other…) Note that NRC will favour quotes in USD. Please read below regarding USD payments.
DO NOT PROVIDE QUOTES IN BOTH SDG AND USD CURRENCIES. |
|
Please confirm your offer inclusive Net price after deduction of discounts |
|
Please confirm your prices include all taxes and fees (net prices) : (if not, please explain and detail the taxes & fees)
|
|
If your offer is in USD => payment will be made by bank transfer.
(please provide bank details for each account)
Please read the note below regarding payments in USD and quote accordingly.
|
|
Do you accept payment after completion of work? (if not, please explain your payment terms upon milestone completion)
|
|
What is the validity period of your offer? (in days) (Preferable 60 days)
|
|
Please confirm that you will be able to transport all the necessary machines to the site locations, and that you will ensure the security of your equipment once on site. |
|
Your company and all your workers must commit to respect the population and to follow the rules and regulations implemented in the site, especially regarding safety and security, and employment = By submitting a quote, you confirm your commitment |
|
Please confirm that your company have the necessary insurances to protect your employees, your equipment, the work site and any third party. |
|
Please confirm you can deliver to our address in : Um Koaro Village - Al Leri - South Kordofan |
|
4 - Accepted methods for submission of quotation / offer :
We recommend you to fill up this Request for Quotation directly on your computer.
You can also print it and fill it up by hand if you have not access to a computer.
You can submit the price offer by using the table on page 1, or by using your own proforma document.
Your quotation / offer must be signed and stamped on all pages (including the present Request for Quotation).
IMPORTANT NOTE regarding USD quotes and payments :
We encourage you to contact us directly if you have questions or need clarifications before submitting your quotation.
|
4 - Your Company details:
Name of the company
|
|
|
Name of the owner(s) Date of birth of the owner(s) (mandatory for screening) |
|
|
Address of the company
|
|
|
Name of contact person
|
|
|
Position
|
|
|
|
|
|
Phone
|
|
|
Beneficiary name: |
|
|
Beneficiary account no.: |
|
|
Beneficiary Bank: |
|
|
Bank branch: |
|
|
SWIFT: |
|
|
IBAN: |
|
|
Bank address: |
|
|
Please provide details of at least 3 client references whom NRC may contact, preferably from NGOs and UN agencies, for similar related works:
Client/company name |
Contact person |
Phone |
|
Contract details (works, location, size, value, etc) |
1. |
|
|
|
|
2. |
|
|
|
|
3. |
|
|
|
|
… |
|
|
|
|
Please provide details of any relevant machinery/equipment/vehicles owned by the company that would potentially be used for construction: (do not mention rented items):
Type of machinery/ equipment/ vehicles |
Quantity |
1. |
|
2. |
|
3. |
|
4. |
|
5. |
|
6. |
|
… |
|
5 - Mandatory documents to attached to your quotation / offer :
Please check that you are providing all of the below mentioned documents:
Mandatory documents |
Checked (Y/N) |
Copy of renewed business license – Compulsory |
|
Copy of VAT registration – Compulsory |
|
Company tax registration certificate – Optional |
|
Availability of Machinery Trucks - Compulsory |
|
Past contracts/ POs as proof of experience for similar contracts – Compulsory |
|
Previous experience in same locality or South Kordofan – Compulsory |
|
Financial Statement from your bank for the last two Year – Compulsory |
|
Detailed delivery schedule - Compulsory |
|
Company Profile – Optional |
|
NRC Request for Quotation (filled up, signed and stamped)
You must Sign and Stamp each page. |
|
You can also attach additional documents such as photos, company profile, certifications…
6 - Payment information:
For payment by cheque, please indicate under which name NRC shall issue the cheque. You can write name in Arabic or in English. (For Payment in SDG)
|
7 - Other information:
Payment will be made by bank transfer/cheque only.
All suppliers doing business with NRC should maintain high standards on ethical issues, respect and apply basic human and social rights, ensure non-exploitation of child labour, and give fair working conditions to their staff. NRC reserves the right to reject quotations provided by suppliers not meeting these standards.
Vendors doing business with NRC will be screened on anti-corruption due diligence before NRC confirms an order or contract.
NRC aims to purchase products and services that the minimum environmental impact. Environmental considerations form part of the NRC selection criteria, and NRC reserves the right to reject quotations provided by suppliers not meeting these standards.
NRC is obliged to ensure that its procurement decisions are clearly justified and documented and keeping within the Donors mandatory principles. In that regard, full and on-the-spot access must be granted to representatives of NRC, the Donor or any organisation or person mandated by it, to premises belonging to NRC or its contractors. The right to access shall include all documents and information necessary to assess, or audit the implementation of the contract
NRC reserves the right to accept or reject the whole or part of your quotation based on the information provided. Incomplete quotations which do not comply with our conditions will not be considered.
Shortlisted suppliers may be required to submit samples of each item. Please be sure to have all samples available at short notice, and wait for a response from NRC if you have been shortlisted.